Amendments to the Approved Documents
This document contains amendments to the following Approved Document:
Approved Document B: Fire safety Volume 1 – Dwellings Volume 2 – Buildings other than dwellings 2019 edition incorporating the 2020 and 2022 amendments
Published September 2024 Taking effect on 2 March 2025
For use in England
Introduction
#Source page 2
This document sets out amendments to guidance previously published in Approved Document B: Fire safety, Volume 1 – Dwellings and Volume 2 – Buildings other than dwellings, 2019 edition incorporating the 2020 and 2022 amendments.
These amendments will be incorporated into both the online and paper versions of Approved Document B Volume 1 and Volume 2 when the changes take effect. Versions from before that date will need to be read alongside the amendments listed in this document. You should always check the online version to know that you are looking at the most up to date version.
The changes highlighted in this amendment booklet take effect on 2 March 2025 for use in England. The 2019 edition incorporating the 2020 and 2022 amendments will continue to apply where a building notice or an initial notice has been given or, to a building control approval application with full plans made to, the relevant authority before 2 March 2025 and either the building work to which it relates:
a.has started and is sufficiently progressed before that day; or
b.is started and is sufficiently progressed within the period of six months beginning on that day.
Please note that ‘building notice’, ‘initial notice’ and ‘building control approval application with full plans’ have the meanings given in the Building Regulations 2010. For the purpose of these transitional arrangements, building work is to be regarded as ‘sufficiently progressed’:
a.where the building work consists of the construction of a building, when the pouring of concrete for the permanent placement of the trench, pad or raft foundations has started, or the permanent placement of piling has started; or
b.where the building work consists of work to an existing building, when that work has started; or
c.where the building work consists of a material change of use of a building, when work to effect that change of use has stated.
The changes focus on the following fire safety provisions:
a.Regulation 38 and fire safety information.
b.Removal of national classes for reaction to fire and roofs.
c.Introduction of new provisions for sprinklers in care homes.
Full details of the changes are provided below.
The Building Regulations 2010
#Source page 3
Approved Document B: Fire safety Volume 1 – Dwellings
2019 edition incorporating the 2020 and 2022 amendments
List of amendments
Taking effect on 2 March 2025
Section 10: Resisting fire spread over external walls
Page 82Paragraph 10.14, delete the second note.
Regulation 38: Fire safety information
Page 111Replace the text box for regulation 38 with the following.
Section 17: Fire safety information
#Source page 4
Section 17: Fire safety information
Page 112Replace the whole of Section 17: Fire safety information with the following.
Section 17: Fire safety information
17.1For building work involving the erection or extension or a change of use of a relevant building (i.e. a building to which the Regulatory Reform (Fire Safety) Order 2005 or the Building Safety Act 2022 applies, or will apply), fire safety information should be given to the relevant dutyholder (responsible person or accountable person) at one of the following times, whichever is the earlier.
a.When the project is complete.
b.When the building or extension is first occupied.
17.2This section is a guide to the information that should be provided and is not exhaustive. Guidance is in terms of essential information and additional information for complex buildings; however, the level of detail required should be considered on a case-by-case basis.
Essential information
#Source page 5
17.3The essential information provided should be sufficient to enable the relevant dutyholder to understand, operate and maintain the building (including the fire safety systems in it). It should make it clear how the fire safety arrangements of the building are intended to operate together. In cases where a fire safety strategy has been prepared (e.g. as part of the design and construction process for a building or building work), then this should be made available to the relevant dutyholder.
17.4Information on the location of fire protection measures may be sufficient. An as-built plan of the building should be provided showing all of the following.
a.Escape routes – this should include exit capacity (i.e. the maximum allowable number of people for each storey and for the building).
b.Fire resisting construction and location of fire-separating elements (including cavity barriers in walk-in spaces).
c.Fire doorsets, fire doorsets fitted with a self-closing device and other doors relevant to the fire safety strategy, such as doors equipped with relevant hardware.
d.Locations of fire detector heads (e.g. heat and smoke detectors), manual call points, fire alarm control and indicating equipment, fire alarm sounders, fire safety signage, emergency lighting, fire extinguishers, dry or wet fire mains and other firefighting equipment, and hydrants outside the building.
e.Any sprinkler systems, including isolating valves and control equipment.
f.Any smoke control systems, or ventilation systems with a smoke control function, including mode of operation and control systems.
g.Any high risk areas (e.g. heating machinery).
h.Any power supplies or power generating installations.
i.The location of secure information boxes.
17.5Details should be provided of all of the following.
a.Specifications of fire safety equipment provided, including routine maintenance schedules.
b.Any assumptions regarding the management of the building in the design of the fire safety arrangements.
c.Any provision enabling the evacuation of disabled people, which can be used when designing personal emergency evacuation plans.
Additional information for complex buildings
#Source page 6
17.6A detailed record should be provided of both of the following.
a.The fire safety strategy.
b.Procedures for operating and maintaining any fire protection measures. This should include an outline cause and effect matrix/ strategy for the building.
Further guidance is available in clause 9 and Annex H of BS 9999.
17.7The records should include details of the following.
a.The fire safety strategy, including all assumptions in the design of the fire safety systems (such as fire load). Any risk assessments or risk analysis.
b.All assumptions in the design of the fire safety arrangements for the management of the building.
c.All of the following.
i.Escape routes (including occupant load and capacity of escape routes).
ii.Any provision to enable the evacuation of disabled people (including the location and mode of operation of evacuation lifts).
iii.Escape strategy (e.g. simultaneous or phased).
iv.Assembly points and/or muster stations.
d.All passive fire safety measures, including all of the following.
i.Compartmentation.
ii.Fire-separating elements.
iii.Fire resisting construction.
iv.Cavity barriers.
v.Fire doorsets, including fire doorsets fitted with a self-closing device and other doors relevant to the fire safety strategy, such as doors equipped with relevant hardware (e.g. electronic security locks).
vi.Fire dampers, fire and smoke dampers, and smoke control dampers.
vii.Fire shutters.
e.All of the following.
i.Fire detector heads (e.g. heat and smoke detectors).
ii.Manual call points.
iii.Fire alarm control and indicating equipment.
iv.Fire alarm sounders.
v.Emergency communications systems.
vi.CCTV.
Appendix B: Performance of materials, products and structures
#Source page 7
vii.Fire safety signage.
viii.Emergency lighting.
ix.Fire extinguishers.
x.Dry or wet fire mains and other firefighting equipment.
xi.Other interior facilities for the fire and rescue service.
xii.Emergency control rooms.
xiii.Location of hydrants outside the building.
xiv.Other exterior facilities for the fire and rescue service.
xv.The location of secure information boxes.
f.All active fire safety measures, including both of the following.
i.Sprinkler system(s) design, including isolating valves and control equipment.
ii.Smoke control system(s) (or heating, ventilation and air conditioning system with a smoke control function) design, including any air inlets, smoke outlets, mode of operation and control systems.
g.Any high risk areas (e.g. heating machinery) and particular hazards.
h.Plans of the building as built, showing the locations of the above.
i.Both of the following.
i.Specifications of any fire safety equipment provided, including all of the following.
•Operational details.
•Operators’ manuals.
•Software.
•System zoning.
•Routine inspection, testing and maintenance schedules.
ii.Records of any acceptance or commissioning tests.
j.Any other details appropriate for the specific building.
Appendix B: Performance of materials, products and structures
Introduction
Page 121Replace paragraphs B1 to B5 with the following.
B1Much of the guidance in this document is given in terms of performance classifications in relation to British or European Standards. In such cases, it will be necessary to demonstrate that a system or product can meet the relevant performance classification. This will be achieved if the system or product complies with one of the following.
a.They should be in accordance with a specification or design that has been shown by specific test(s) to be capable of meeting that performance classification.
Page 8
#Source page 8
b.They should have been designed by using relevant design standards in order to meet that performance classification.
c.They should have been assessed by applying relevant test evidence, in lieu of carrying out a specific test, as being capable of meeting that performance classification.
B2Any test evidence used to demonstrate the fire performance classification of a product or system should be carefully checked to ensure that it is applicable to the intended use. Small differences in detail, such as fixing method, joints, dimensions, the introduction of insulation materials and air gaps (ventilated or not), might significantly affect the performance and should be tested or assessed in accordance with paragraph B1.
B3Assessments should not be regarded as a way to avoid a test where one is necessary. Assessments should only be carried out where sufficient relevant test evidence is available. Relevant test evidence is unlikely to be provided by test standards which have different classification criteria.
B4Where it is proposed to assess the classification of a product or system in lieu of carrying out a specific test (as in paragraph B1c), this should be done in accordance with the relevant standard for extended application for the test in question and should include details of the test evidence that has been used to support the assessment.
For performance classifications where there is no specific standard for extended application, assessment reports should be produced in accordance with the principles of BS EN 15725 and should include details of the test evidence that has been used to support the assessment. In cases where the end use application is not covered by the extended application standard and an assessment is the only other suitable approach, then further information on best practice is provided in the Passive Fire Protection Forum’s Guide to Undertaking Technical Assessments of the Fire Performance of Construction Products Based on Fire Test Evidence. The same principle should be followed for assessments as described in paragraph B2.
B5Tests and assessments should be carried out by organisations with the necessary expertise. For example, organisations listed as ‘notified bodies’ in accordance with the European Construction Products Regulation or laboratories accredited by the United Kingdom Accreditation Service (UKAS) for the relevant test standard can be assumed to have the necessary expertise.
Reaction to fire
#Source page 9
Page 122Replace paragraph B8 with the following.
B8To reduce the testing burden on manufacturers, BS EN 13238 defines a number of standard substrates that produce test results representative of different end use applications. The classification for reaction to fire achieved during testing is only valid when the product is used within this direct field of application, i.e. when the product is fixed to a substrate of that class in its end use. The standard substrate selected for testing should take account of the intended end use applications (field of application) of the product and represent end use substrates that have a density of a minimum of 75% of the standard substrate’s nominal density.
National classifications for reaction to fire
Pages 122 and 123Delete the section National classifications for reaction to fire.
Thermoplastic materials
Page 123 and 124Replace paragraph B13 with the following.
B12For the purposes of requirements B2 and B4, thermoplastic materials should be classified as TP(a) rigid, TP(a) flexible or TP(b), as follows:
a.TP(a) rigid
i.rigid solid uPVC sheet
ii.solid (as distinct from double- or multi-skinned) polycarbonate sheet a minimum of 3mm thick
iii.any other rigid thermoplastic product, a specimen of which (at the thickness of the product as put on the market), when tested to BS 2782-0 Method 508A, performs so that both:
•the test flame extinguishes before the first mark
•the duration of flaming or afterglow does not exceed 5 seconds following removal of the burner.
b.TP(a) flexible
Flexible products a maximum of 1mm thick that comply with the Type C requirements of BS 5867-2 when tested to BS 5438 Test 2 with the flame applied to the surface of the specimens for 5, 15, 20 and 30 seconds respectively, but excluding the cleansing procedure; and
c.TP(b)
i.rigid solid polycarbonate sheet products a maximum of 3mm thick, or multi-skinned polycarbonate sheet products that do not qualify as TP(a) by test
ii.other products which, when a specimen of the material between 1.5 and 3mm thick is tested in accordance with BS 2782-0 Method 508A, have a maximum rate of burning of 50mm/minute.
Roofs
#Source page 10
Page 125Replace paragraph B18 with the following.
B17This document uses the European classification system for roof covering set out in BS EN 13501-5; however, there may be some products or systems whose performance will need to be assessed based on the recommendations of paragraphs B1 to B5 as being capable of meeting that performance classification.
Page 125Delete Table B2.
Page 125Delete the note after Table B2.
Appendix F: Standards referred to
British Standards
Page 150Replace the section on BS 476 Fire tests on building materials and structures with the following.
BS 476 Fire tests on building materials and structures
•BS 476-8 Test methods and criteria for the fire resistance of elements of building construction [1972]
•BS 476-20 Method for determination of the fire resistance of elements of construction (general principles) [1987]
•BS 476-21 Methods for determination of the fire resistance of loadbearing elements of construction [1987]
•BS 476-22 Methods for determination of the fire resistance of non-loadbearing elements of construction [1987]
•BS 476-23 Methods for determination of the contribution of components to the fire resistance of a structure [1987]
•BS 476-24 Method for determination of the fire resistance of ventilation ducts [1987]
•BS 476-31.1 Methods for measuring smoke penetration through doorsets and shutter assemblies. Method of measurement under ambient temperature conditions [1983]
Page 151Replace the entry for BS 9251 with the following.
BS 9251 Fire sprinkler systems for domestic and residential occupancies. Code of practice [2021].
Index
Page 155In the index entry for British Standards, delete the following sub-entries.
•BS 476-3 Table B2
•BS 476-6 Table B1
•BS 476-7 Appendix B13, Table B1
Page 11
#Source page 11
Page 155In the index entry for British Standards, replace the sub-entry for ‘BS EN 13501-1’ with the following.
BS EN 13501-1 page 76, Appendix B6
In the index entry for British Standards, replace the sub-entry for ‘BS EN 1351-5’ with the following
BS EN 13501-5 Appendix B15 to B17
Page 160In the index entry for Fire performance, replace the sub-entry for ‘Classification and testing’ with the following.
Classification and testing Appendix B1 to B9
In the index entry for Fire performance, replace the sub-entry for ‘Roofs’ with the following.
Roofs Appendix B14 to B17
Page 165In the index entry for Roof coverings, delete the following sub-entry.
Performance classification Table B2
The Building Regulations 2010
#Source page 12
Approved Document B: Fire safety Volume 2 – Buildings other than dwellings
2019 edition incorporating the 2020 and 2022 amendments
List of amendments
Taking effect on 2 March 2025
Section 2: Design for horizontal escape
Residential care homes
Bedrooms
Page 26Replace paragraph 2.43 with the following.
2.43Bedrooms should not contain more than one single or double bed.
Sprinkler systems
Page 27Replace paragraph 2.46 with the following.
2.46Care homes should be fitted with a sprinkler system throughout the building in accordance with Appendix E.
Section 12: Resisting fire spread over external walls
Page 97Paragraph 12.15, delete the second note.
Regulation 38: Fire safety information
Page 126Replace the text box for regulation 38 with the following.
Section 19: Fire safety information
#Source page 13
Section 19: Fire safety information
Replace the whole of Section 19: Fire safety information with the following.
Section 19: Fire safety information
19.1For building work involving the erection or extension or a change of use of a relevant building (i.e. a building to which the Regulatory Reform (Fire Safety) Order 2005 or the Building Safety Act 2022 applies, or will apply), fire safety information should be given to the relevant dutyholder (responsible person or accountable person) at one of the following times, whichever is the earlier.
a.When the project is complete.
Essential information
#Source page 14
b.When the building or extension is first occupied.
19.2This section is a guide to the information that should be provided and is not exhaustive. Guidance is in terms of essential information and additional information for complex buildings; however, the level of detail required should be considered on a case-by-case basis.
Essential information
19.3The essential information provided should be sufficient to enable the relevant dutyholder to understand, operate and maintain the building (including the fire safety systems in it). It should make it clear how the fire safety arrangements of the building are intended to operate together. In cases where a fire safety strategy has been prepared (e.g. as part of the design and construction process for a building or building work), then this should be made available to the relevant dutyholder.
19.4Information on the location of fire protection measures may be sufficient. An as-built plan of the building should be provided showing all of the following.
a.Escape routes – this should include exit capacity (i.e. the maximum allowable number of people for each storey and for the building).
b.Fire resisting construction and location of fire-separating elements (including cavity barriers in walk-in spaces).
c.Fire doorsets, fire doorsets fitted with a self-closing device and other doors relevant to the fire safety strategy, such as doors equipped with relevant hardware.
d.Locations of fire detector heads (e.g. heat and smoke detectors), manual call points, fire alarm control and indicating equipment, fire alarm sounders, fire safety signage, emergency lighting, fire extinguishers, dry or wet fire mains and other firefighting equipment, and hydrants outside the building.
e.Any sprinkler systems, including isolating valves and control equipment.
f.Any smoke control systems, or ventilation systems with a smoke control function, including mode of operation and control systems.
g.Any high risk areas (e.g. heating machinery).
h.Any power supplies or power generating installations.
i.The location of secure information boxes.
19.5Details should be provided of all of the following.
a.Specifications of fire safety equipment provided, including routine maintenance schedules.
b.Any assumptions regarding the management of the building in the design of the fire safety arrangements.
c.Any provision enabling the evacuation of disabled people, which can be used when designing personal emergency evacuation plans.
d.Information for care homes should include the assessment for the number of beds in a compartment, as this should set out the expected number of staff and level of assistance of residents (see paragraph 2.39).
Additional information for complex buildings
#Source page 15
19.6A detailed record should be provided of both of the following.
a.The fire safety strategy.
b.Procedures for operating and maintaining any fire protection measures. This should include an outline cause and effect matrix/strategy for the building. Further guidance is available in clause 9 and Annex H of BS 9999.
19.7The records should include details of the following.
a.The fire safety strategy, including all assumptions in the design of the fire safety systems (such as fire load). Any risk assessments or risk analysis.
b.All assumptions in the design of the fire safety arrangements for the management of the building.
c.All of the following.
i.Escape routes (including occupant load and capacity of escape routes).
ii.Any provision to enable the evacuation of disabled people (including the location and mode of operation of evacuation lifts).
iii.Escape strategy (e.g. simultaneous or phased).
iv.Assembly points and/or muster stations.
d.All passive fire safety measures, including all of the following.
i.Compartmentation.
ii.Fire-separating elements.
iii.Fire resisting construction.
iv.Cavity barriers.
v.Fire doorsets, including fire doorsets fitted with a self-closing device and other doors relevant to the fire safety strategy, such as doors equipped with relevant hardware (e.g. electronic security locks).
vi.Fire dampers, fire and smoke dampers, and smoke control dampers.
vii.Fire shutters.
e.All of the following.
i.Fire detector heads (e.g. heat and smoke detectors).
ii.Manual call points.
iii.Fire alarm control and indicating equipment.
iv.Fire alarm sounders.
v.Emergency communications systems.
vi.CCTV.
Appendix B: Performance of materials, products and structures
#Source page 16
vii.Fire safety signage.
viii.Emergency lighting.
ix.Fire extinguishers.
x.Dry or wet fire mains and other firefighting equipment.
xi.Other interior facilities for the fire and rescue service.
xii.Emergency control rooms.
xiii.Location of hydrants outside the building.
xiv.Other exterior facilities for the fire and rescue service.
xv.The location of secure information boxes.
f.All active fire safety measures, including both of the following.
i.Sprinkler system(s) design, including isolating valves and control equipment.
ii.Smoke control system(s) (or heating, ventilation and air conditioning system with a smoke control function) design, including any air inlets, smoke outlets, mode of operation and control systems.
g.Any high risk areas (e.g. heating machinery) and particular hazards.
h.Plans of the building as built, showing the locations of the above.
i.Both of the following.
i.Specifications of any fire safety equipment provided, including all of the following.
•Operational details.
•Operators’ manuals.
•Software.
•System zoning.
•Routine inspection, testing and maintenance schedules.
ii.Records of any acceptance or commissioning tests.
j.Any other details appropriate for the specific building.
Appendix B: Performance of materials, products and structures
Introduction
Replace paragraphs B1 to B5 with the following.
B1Much of the guidance in this document is given in terms of performance classifications in relation to British or European Standards. In such cases, it will be necessary to demonstrate that a system or product can meet the relevant performance classification. This will be achieved if the system or product complies with one of the following.
a.They should be in accordance with a specification or design that has been shown by specific test(s) to be capable of meeting that performance classification.
Page 17
#Source page 17
b.They should have been designed by using relevant design standards in order to meet that performance classification.
c.They should have been assessed by applying relevant test evidence, in lieu of carrying out a specific test, as being capable of meeting that performance classification.
B2Any test evidence used to demonstrate the fire performance classification of a product or system should be carefully checked to ensure that it is applicable to the intended use. Small differences in detail, such as fixing method, joints, dimensions, the introduction of insulation materials and air gaps (ventilated or not), might significantly affect the performance and should be tested or assessed in accordance with paragraph B1.
B3Assessments should not be regarded as a way to avoid a test where one is necessary. Assessments should only be carried out where sufficient relevant test evidence is available. Relevant test evidence is unlikely to be provided by test standards which have different classification criteria.
B4Where it is proposed to assess the classification of a product or system in lieu of carrying out a specific test (as in paragraph B1c), this should be done in accordance with the relevant standard for extended application for the test in question and should include details of the test evidence that has been used to support the assessment.
For performance classifications where there is no specific standard for extended application, assessment reports should be produced in accordance with the principles of BS EN 15725 and should include details of the test evidence that has been used to support the assessment. In cases where the end use application is not covered by the extended application standard and an assessment is the only other suitable approach, then further information on best practice is provided in the Passive Fire Protection Forum’s Guide to Undertaking Technical Assessments of the Fire Performance of Construction Products Based on Fire Test Evidence. The same principle should be followed for assessments as described in paragraph B2.
B5Tests and assessments should be carried out by organisations with the necessary expertise. For example, organisations listed as ‘notified bodies’ in accordance with the European Construction Products Regulation or laboratories accredited by the United Kingdom Accreditation Service (UKAS) for the relevant test standard can be assumed to have the necessary expertise.
Reaction to fire
#Source page 18
Page 137Replace paragraph B8 with the following.
B8To reduce the testing burden on manufacturers, BS EN 13238 defines a number of standard substrates that produce test results representative of different end use applications. The classification for reaction to fire achieved during testing is only valid when the product is used within this direct field of application, i.e. when the product is fixed to a substrate of that class in its end use. The standard substrate selected for testing should take account of the intended end use applications (field of application) of the product and represent end use substrates that have a density of a minimum of 75% of the standard substrate’s nominal density.
National classifications for reaction to fire
Pages 137 and 138Delete the section National classifications for reaction to fire.
Thermoplastic materials
Page 138 and 139Replace paragraph B13 with the following.
B12For the purposes of requirements B2 and B4, thermoplastic materials should be classified as TP(a) rigid, TP(a) flexible or TP(b), as follows:
a.TP(a) rigid
i.rigid solid uPVC sheet
ii.solid (as distinct from double- or multi-skinned) polycarbonate sheet a minimum of 3mm thick
iii.any other rigid thermoplastic product, a specimen of which (at the thickness of the product as put on the market), when tested to BS 2782-0 Method 508A, performs so that both:
•the test flame extinguishes before the first mark
•the duration of flaming or afterglow does not exceed 5 seconds following removal of the burner.
b.TP(a) flexible Flexible products a maximum of 1mm thick that comply with the Type C requirements of BS 5867-2 when tested to BS 5438 Test 2 with the flame applied to the surface of the specimens for 5, 15, 20 and 30 seconds respectively, but excluding the cleansing procedure; and
c.TP(b)
i.rigid solid polycarbonate sheet products a maximum of 3mm thick, or multi-skinned polycarbonate sheet products that do not qualify as TP(a) by test
ii.other products which, when a specimen of the material between 1.5 and 3mm thick is tested in accordance with BS 2782-0 Method 508A, have a maximum rate of burning of 50mm/minute.
Roofs
#Source page 19
Page 139 and 140Replace paragraph B18 with the following.
B17This document uses the European classification system for roof covering set out in BS EN 13501-5; however, there may be some products or systems whose performance will need to be assessed based on the recommendations of paragraphs B1 to B5 as being capable of meeting that performance classification.
Page 140Delete Table B2.
Page 140Delete the note after Table B2.
Appendix F: Standards referred to
British Standards
Page 165Replace the section on BS 476 Fire tests on building materials and structures with the following.
BS 476 Fire tests on building materials and structures
BS 476-8 Test methods and criteria for the fire resistance of elements of building construction [1972]
BS 476-20 Method for determination of the fire resistance of elements of construction (general principles) [1987]
BS 476-21 Methods for determination of the fire resistance of loadbearing elements of construction [1987]
BS 476-22 Methods for determination of the fire resistance of non-loadbearing elements of construction [1987]
BS 476-23 Methods for determination of the contribution of components to the fire resistance of a structure [1987]
BS 476-24 Method for determination of the fire resistance of ventilation ducts [1987]
BS 476-31.1 Methods for measuring smoke penetration through doorsets and shutter assemblies. Method of measurement under ambient temperature conditions [1983]
Page 166Replace the entry for BS 9251 with the following.
BS 9251 Fire sprinkler systems for domestic and residential occupancies. Code of practice [2021].
Index
Page 170In the index entry for British Standards, delete the following sub-entries.
BS 476-3 Table B2
BS 476-6 Table B1
BS 476-7 Appendix B13, Table B1
BS 476-11 Table B1
Page 20
#Source page 20
Page 171In the index entry for British Standards, replace the sub-entry for ‘BS EN 13501-1’ with the following.
BS EN 13501-1 page 91, Appendix B6
In the index entry for British Standards, replace the sub-entry for ‘BS EN 1351-5’ with the following
BS EN 13501-5 Appendix B15 to B17
Page 177In the index entry for Fire performance, replace the sub-entry for ‘Roofs’ with the following.
Roofs Appendix B14 to B17
Page 186In the index entry for Roof coverings, delete the following sub-entry.
Fire resistance Table B2
List of Approved Documents
#Source page 21
The following documents have been published to give guidance on how to meet the Building Regulations. You can find the date of the edition approved by the Secretary of State at www.gov.uk.
Approved Document A Structure
Approved Document B Fire safety Volume 1: Dwellings
Approved Document B Fire safety Volume 2: Buildings other than dwellings
Approved Document C Site preparation and resistance to contaminants and moisture
Approved Document D Toxic substances
Approved Document E Resistance to the passage of sound
Approved Document F Ventilation Volume 1: Dwellings
Approved Document F Ventilation Volume 2: Buildings other than dwellings
Approved Document G Sanitation, hot water safety and water efficiency
Approved Document H Drainage and waste disposal
Approved Document J Combustion appliances and fuel storage systems
Approved Document K Protection from falling, collision and impact
Approved Document L Conservation of fuel and power Volume 1: Dwellings
Approved Document L Conservation of fuel and power Volume 2: Buildings other than dwellings
Approved Document M Access to and use of buildings Volume 1: Dwellings
Approved Document M Access to and use of buildings Volume 2: Buildings other than dwellings
Approved Document O Overheating
Approved Document P Electrical safety – Dwellings
Approved Document Q Security – Dwellings
Approved Document R Infrastructure for electronic communications Volume 1: Physical infrastructure and network connection for new dwellings
Approved Document R Infrastructure for electronic communications Volume 2: Physical infrastructure for high-speed electronic communications networks
Approved Document S Infrastructure for the charging of electric vehicles
Approved Document T Toilet accommodation
Approved Document 7 Materials and workmanship
Page 22
#Source page 22
The Building Regulations 2010, Approved Documents are available from:
RIBA Books Online: www.ribabooks.com Telephone: (0)207 307 5355 Email: sales@ribabooks.com
© Crown copyright, 2024
You may re-use this information (excluding logos) free of charge in any format or medium, under the terms of the Open Government Licence v3.
To view this licence, visit www.nationalarchives.gov.uk/doc/open-government-licence/version/3/ or write to the Information Policy Team, The National Archives, Kew, London TW9 4DU or email psi@nationalarchives.gsi.gov.uk.
Where we have identified any third-party copyright information, you will need to obtain permission from the copyright holders concerned. This publication is available for download at www.gov.uk.
Copyright in the typographical arrangement, excluding logos, of the cover and internal page layouts of this publication rests with the publisher.