The Building Regulations 2010
#Source page 1
Amendments to the Approved Documents
This document contains amendments to the following Approved Document:
Approved Document B: Fire safety Volume 1 – Dwellings Volume 2 – Buildings other than dwellings 2019 edition incorporating the 2020, 2022, 2025 and 2026 amendments
Published September 2024 Taking effect on 2 September 2029
For use in England
Introduction
#Source page 2
This document sets out amendments to guidance previously published in Approved Document B: Fire safety, Volume 1 – Dwellings and Volume 2 – Buildings other than dwellings, 2019 edition incorporating the 2020, 2022, 2025 and 2026 amendments.
These amendments will be incorporated into both the online and paper versions of Approved Document B Volume 1 and Volume 2 when the changes take effect. Versions from before that date will need to be read alongside the amendments listed in this document. You should always check the online version to know that you are looking at the most up to date version.
The changes highlighted in this amendment booklet take effect on 2 September 2029 for use in England. The 2019 edition incorporating the 2020, 2022, 2025 and 2026 amendments will continue to apply where a building notice or an initial notice has been given to, or a building control approval application with full plans made to, the relevant authority before 2 September 2029 and either the building work to which it relates:
a.has started and is sufficiently progressed before that day; or
b.is started and is sufficiently progressed within the period of six months beginning on that day.
Please note that ‘building notice’, ‘initial notice’ and ‘building control approval application with full plans’ have the meanings given in the Building Regulations 2010. For the purpose of these transitional arrangements, building work is to be regarded as ‘sufficiently progressed’:
a.where the building work consists of the construction of a building, when the pouring of concrete for the permanent placement of the trench, pad or raft foundations has started, or the permanent placement of piling has started; or
b.where the building work consists of work to an existing building, when that work has started; or
c.where the building work consists of a material change of use of a building, when work to effect that change of use has stated.
The changes focus on the fire safety provisions regarding the removal of national classes for fire resistance.
Full details of the changes are provided below.
The Building Regulations 2010
#Source page 3
Approved Document B: Fire safety Volume 1 – Dwellings
2019 edition incorporating the 2020, 2022, 2025 and 2026 amendments
List of amendments
Taking effect on 2 September 2029
Pages 121 to 135
Appendix B: Performance of materials, products and structures Replace the whole of Appendix B: Performance of materials, products and structures with the following.
Introduction
B1The guidance in this document is given in terms of performance classifications in relation to European Standards. In such cases, it will be necessary to demonstrate that a system or product can meet the relevant performance classification. This will be achieved if the system or product complies with one of the following.
a.They should be in accordance with a specification or design that has been shown by specific test(s) to be capable of meeting that performance classification.
b.They should have been designed by using relevant design standards in order to meet that performance classification.
c.They should have been assessed by applying relevant test evidence, in lieu of carrying out a specific test, as being capable of meeting that performance classification.
B2Any test evidence used to demonstrate the fire performance classification of a product or system should be carefully checked to ensure that it is applicable to the intended use. Small differences in detail, such as fixing method, joints, dimensions, the introduction of insulation materials and air gaps (ventilated or not), might significantly affect the performance and should be tested or assessed in accordance with paragraph B1.
Reaction to fire
#Source page 4
B3Assessments should not be regarded as a way to avoid a test where one is necessary. Assessments should only be carried out where sufficient relevant test evidence is available. Relevant test evidence is unlikely to be provided by test standards which have different classification criteria.
B4Where it is proposed to assess the classification of a product or system in lieu of carrying out a specific test (as in paragraph B1c), this should be done in accordance with the relevant standard for extended application for the test in question and should include details of the test evidence that has been used to support the assessment.
For performance classifications where there is no specific standard for extended application, assessment reports should be produced in accordance with the principles of BS EN 15725 and should include details of the test evidence that has been used to support the assessment. In cases where the end use application is not covered by the extended application standard and an assessment is the only other suitable approach, then further information on best practice is provided in the Passive Fire Protection Forum’s Guide to Undertaking Technical Assessments of the Fire Performance of Construction Products Based on Fire Test Evidence. The same principle should be followed for assessments as described in paragraph B2.
B5Tests and assessments should be carried out by organisations with the necessary expertise. For example, organisations listed as ‘notified bodies’ in accordance with the European Construction Products Regulation or laboratories accredited by the United Kingdom Accreditation Service (UKAS) for the relevant test standard can be assumed to have the necessary expertise.
Reaction to fire
B6Reaction to fire relates to the degree to which a product will contribute, by its own decomposition, to a fire under specified conditions. Products, other than floorings, are classified as A1, A2, B, C, D, E or F (with class A1 being the highest performance and F being the lowest) in accordance with BS EN 13501-1. Class F is assigned when a product fails to attain class E. Untested products cannot be classified in accordance with BS EN 13501-1.
Materials covered by the Classification Without Further Testing (CWFT) process can be found by accessing the European Commission’s website https://eur-lex.europa.eu/.
B7The classes of reaction to fire performance of A2, B, C, D and E are accompanied by additional classifications related to the production of smoke (s1, s2, s3), with s1 indicating the lowest production, and/or flaming droplets/particles (d0, d1, d2), with d0 indicating the lowest production.
Thermoplastic materials
#Source page 5
B8To reduce the testing burden on manufacturers, BS EN 13238 defines a number of standard substrates that produce test results representative of different end use applications. The classification for reaction to fire achieved during testing is only valid when the product is used within this direct field of application, i.e. when the product is fixed to a substrate of that class in its end use. The standard substrate selected for testing should take account of the intended end use applications (field of application) of the product and represent end use substrates that have a density of a minimum of 75% of the standard substrate’s nominal density.
B9Standard substrates include gypsum plasterboard (BS EN 520) with a density of 700+/-100kg/m³, calcium silicate board (BS EN 14306) 870+/-50kg/m³ and fibre-cement board 1800+/-200kg/m³.
Thermoplastic materials
B10Thermoplastic material is any synthetic polymeric material that has a softening point below 200°C if tested to BS EN ISO 306 Method A120. Products formed from these materials cannot always be classified in the normal way. In those circumstances the following approach can be followed.
B11Thermoplastic materials used for window glazing, rooflights and lighting diffusers within suspended ceilings do not need to meet the criteria within paragraph B18 onwards, if the guidance to requirements B2 and B4 is followed.
B12For the purposes of requirements B2 and B4 thermoplastic materials should be classified as TP(a) rigid, TP(a) flexible or TP(b), as follows:
a.TP(a) rigid
i.rigid solid uPVC sheet
ii.solid (as distinct from double- or multi-skinned) polycarbonate sheet a minimum of 3mm thick
iii.any other rigid thermoplastic product, a specimen of which (at the thickness of the product as put on the market), when tested to BS 2782-0 Method 508A, performs so that both:
•the test flame extinguishes before the first mark
•the duration of flaming or afterglow does not exceed 5 seconds following removal of the burner.
Roofs
#Source page 6
b.TP(a) flexible
Flexible products a maximum of 1mm thick that comply with the Type C requirements of BS 5867-2 when tested to BS 5438 Test 2 with the flame applied to the surface of the specimens for 5, 15, 20 and 30 seconds respectively, but excluding the cleansing procedure; and
c.TP(b)
i.rigid solid polycarbonate sheet products a maximum of 3mm thick, or multi-skinned polycarbonate sheet products that do not qualify as TP(a) by test
ii.other products which, when a specimen of the material between 1.5 and 3mm thick is tested in accordance with BS 2782-0 Method 508A, have a maximum rate of burning of 50mm/minute.
B13A thermoplastic material alone when used as a lining to a wall or ceiling cannot be assumed to protect a substrate. The surface rating of both thermoplastic material and substrate must therefore meet the required classification.
If, however, the thermoplastic material is fully bonded to a non-thermoplastic substrate, then only the surface rating of the composite needs to meet the required classification.
Roofs
B14Performance of the resistance of roofs to external fire exposure is measured in terms of penetration through the roof construction and the spread of flame over its surface.
B15Roof constructions are classified within the European system as BROOF(t4), CROOF(t4), DROOF(t4), EROOF(t4) or FROOF(t4) in accordance with **BS EN 13501-5**. BROOF(t4) indicates the highest performance and F_ROOF(t4) the lowest.
B16BS EN 13501-5 refers to four separate roof tests. The suffix (t4) used in paragraph B15 indicates that Test 4 is to be used for the purposes of this approved document.
B17This document uses the European classification system for roof covering set out in BS EN 13501-5; however, there may be some products or systems whose performance will need to be assessed based on the recommendations of paragraphs B1 to B5 as being capable of meeting that performance classification.
Fire resistance
B18Common to all of the provisions of Part B of the Building Regulations is the property of fire resistance. Fire resistance is a measure of one or more of the following criteria.
a.Resistance to collapse (loadbearing capacity), which applies to loadbearing elements only, denoted R in the European classification of the resistance to fire performance.
Page 7
#Source page 7
b.Resistance to fire penetration (integrity), denoted E in the European classification of the resistance to fire performance.
c.Resistance to the transfer of excessive heat (insulation), denoted I in the European classification of the resistance to fire performance.
B19The standards of fire resistance necessary for a particular building are based on assumptions about the severity of fires and the consequences should an element fail. Fire severity is estimated in very broad terms from the use of the building (its purpose group), on the assumption that the building contents (which constitute the fire load) are similar for buildings with the same use.
B20Because the use of buildings may change, a precise estimate of fire severity based on the fire load due to a particular use may be misleading. Therefore if a fire engineering approach of this kind is adopted, the likelihood that the fire load may change in the future needs to be considered.
B21Performance in terms of the fire resistance to be achieved by elements of structure, doors and other forms of construction is classified in accordance with one of the following.
a.BS EN 13501-2.
b.BS EN 13501-3.
c.BS EN 13501-4.
B22Fire resistance is measured in minutes. This relates to time elapsed in a standard test and should not be confused with real time.
B23The fire resistance necessary for different circumstances is set out in the following tables.
a.Table B1 gives the specific requirements for each element of structure.
b.Table B2 sets out the minimum periods of fire resistance for elements of structure.
c.Table B3 sets out limitations on the use of uninsulated fire resisting glazed elements.
B24This document uses the European classification system (REI) for fire resistance set out in BS EN 13501-2 to 4. Fire resistance is expressed as REI X, where X is the period of fire resistance in minutes in terms of loadbearing capacity (R), integrity (E) and insulation (I). Products or systems cannot typically assume a European class unless they have been tested and classified accordingly.
Page 8
#Source page 8
B25Products or systems achieving the European classification (REI) should be specified wherever possible. However, there may be some products or systems that have been assessed as being capable of meeting a fire resistance performance classification. When assessed, products or systems should follow the relevant test standards to indicate their fire resistance performance in terms of loadbearing capacity, integrity and insulation based on the recommendations of paragraphs B1 to B5. In those situations, the performance classifications given in Table B1 and Table B2 may be used.
| Part of building | Loadbearing capacity | Integrity | Insulation | Type of exposure |
|---|---|---|---|---|
| 1. Structural frame, beam or column. | See Table B2 | Not applicable | Not applicable | Exposed faces |
| 2. Loadbearing wall (For a wall which is also described in any of the following items, the more onerous guidance should be applied). | See Table B2 | Not applicable | Not applicable | Each side separately |
| 3. Floors(4) | — | — | — | — |
| a. between a shop and flat above | 60 min or see Table B2 (whichever is greater) | 60 min or see Table B2 (whichever is greater) | 60 min or see Table B2 (whichever is greater) | From underside(5) |
| b. in upper storey of two storey dwellinghouse (but not over garage or basement) | 30 min | 15 min | 15 min | From underside (5) |
| c. any other floor – including compartment floors. | See Table B2 | See Table B2 | See Table B2 | From underside (5) |
| 4. Roofs | — | — | — | — |
| a. any part forming an escape route | 30 min | 30 min | 30 min | From underside (5) |
| b. any roof that performs the function of a floor. | See Table B2 | See Table B2 | See Table B2 | From underside (5) |
| 5. External walls | — | — | — | — |
| a. any part a maximum of 1000mm from any point on the relevant boundary(6) | See Table B2 | See Table B2 | See Table B2 | Each side separately |
| b. any part a minimum of 1000mm from the relevant boundary(6) | See Table B2 | See Table B2 | 15 min | From inside the building |
| c. any part beside an external escape route (Section 2, Diagram 2.7 and Section 3, Diagram 3.11). | 30 min | 30 min | No provision(7) (8) | From inside the building |
| 6. Compartment walls Separating either: | — | — | — | — |
| a. a flat from any other part of the building (see paragraph 7.1) | 60 min or see Table B2 (whichever is less) | 60 min or see Table B2 (whichever is less) | 60 min or see Table B2 (whichever is less) | Each side separately |
| b. occupancies. | 60 min or see Table B2 (whichever is less) | 60 min or see Table B2 (whichever is less) | 60 min or see Table B2 (whichever is less) | Each side separately |
(1) Minimum provisions when tested and classified to the relevant European standard (minutes) or assessed following the recommendations of paragraphs B1 to B5 (minutes)(2).
(3) Loadbearing capacity.
(4) Floors.
(5) From underside.
(6) Relevant boundary.
(7) No provision.
(8) Footnote marker shown in the table.
Page 9
#Source page 9
| Part of building | Loadbearing capacity | Integrity | Insulation | Type of exposure |
|---|---|---|---|---|
| 7. Compartment walls (other than in item 6 or item 10). | See Table B2 | See Table B2 | See Table B2 | Each side separately |
| 8. Protected shafts Excluding any firefighting shaft: a. any glazing described in Section 7, Diagram 7.2 | Not applicable | 30 min | No provision⁽⁸⁾ | Each side separately |
| 8. Protected shafts Excluding any firefighting shaft: b. any other part between the shaft and a protected lobby/corridor described in Section 7, Diagram 7.2 | 30 min | 30 min | 30 min | Each side separately |
| 8. Protected shafts Excluding any firefighting shaft: c. any part not described in (a) or (b) above. | See Table B2 | See Table B2 | See Table B2 | Each side separately |
| 9. Enclosure (that does not form part of a compartment wall or a protected shaft) to a: a. protected stairway | 30 min | 30 min | 30 min⁽⁸⁾ | Each side separately |
| 9. Enclosure (that does not form part of a compartment wall or a protected shaft) to a: b. lift shaft. | 30 min | 30 min | 30 min | Each side separately |
| 10. Wall or floor separating an attached or integral garage from a dwellinghouse | 30 min | 30 min | 30 min⁽⁸⁾ | From garage side |
| 11. Fire resisting construction in dwellinghouses not described elsewhere | 30 min | 30 min | 30 min⁽⁸⁾ | Each side separately |
| 12. Firefighting shafts | 120 min | 120 min | 120 min | From side remote from shaft |
| 12. Firefighting shafts a. construction that separates firefighting shaft from rest of building | 60 min | 60 min | 60 min | From shaft side |
| 12. Firefighting shafts b. construction that separates firefighting stair, firefighting lift shaft and firefighting lobby. | 60 min | 60 min | 60 min | Each side separately |
| 13. Enclosure (that is not a compartment wall or described in item 8) to a: a. protected lobby | 30 min | 30 min | 30 min⁽⁸⁾ | Each side separately |
| 13. Enclosure (that is not a compartment wall or described in item 8) to a: b. protected corridor. | 30 min | 30 min | 30 min⁽⁸⁾ | Each side separately |
| 14. Sub-division of a corridor | 30 min | 30 min | 30 min⁽⁸⁾ | Each side separately |
Minimum provisions when tested and classified to the relevant European standard (minutes)⁽¹⁾ or assessed following the recommendations of paragraphs B1 to B5 (minutes)⁽²⁾.
Page 10
#Source page 10
| Part of building | Loadbearing capacity | Integrity | Insulation | Type of exposure |
|---|---|---|---|---|
| 15. Fire resisting construction a. construction that encloses places of special fire hazard | 30 min | 30 min | 30 min | Each side separately |
| 15. Fire resisting construction b. construction between store rooms and sales area in shops | 30 min | 30 min | 30 min | Each side separately |
| 15. Fire resisting construction c. fire resisting sub-division | 30 min | 30 min | 30 min | Each side separately |
| 15. Fire resisting construction d. construction that encloses bedrooms and ancillary accommodation in care homes. | 30 min | 30 min | 30 min | Each side separately |
| 16. Enclosure in a flat to a protected entrance hall, or to a protected landing. | 30 min | 30 min | 30 min⁽⁸⁾ | Each side separately |
| 17. Cavity barrier | Not applicable | 30 min | 15 min | Each side separately |
| 18. Ceiling see paragraph 2.5 and Diagram 2.3; paragraph 8.5 and Diagram 8.3. | Not applicable | 30 min | 30 min | From underside |
| 19. Duct described in paragraph 5.24e. | Not applicable | 30 min | No provision | From outside |
| 20. Casing around a drainage system described in Diagram 9.1. | Not applicable | 30 min | No provision | From outside |
| 21. Flue walls described in Diagram 9.5. | Not applicable | Half the period given in Table B2 for the compartment wall/floor | Half the period given in Table B2 for the compartment wall/floor | From outside |
| 22. Construction described in note (a) to paragraph 12.9. | Not applicable | 30 min | 30 min | From underside |
Minimum provisions when tested and classified to the relevant European standard (minutes)⁽¹⁾ or assessed following the recommendations of paragraphs B1 to B5 (minutes)⁽²⁾.
Page 11
#Source page 11
| Part of building | Loadbearing capacity | Integrity | Insulation | Type of exposure |
|---|---|---|---|---|
| 23. Fire doorsets | See Table C1 | See Appendix C |
NOTES: 1. Classified in accordance with BS EN 13501-2, BS EN 13501-3 or BS EN 13501-4. In the European classification ‘R’ is the resistance to fire in terms of loadbearing capacity, ‘E’ is the resistance to fire in terms of integrity, ‘I’ is the resistance to fire in terms of insulation. Products or systems cannot typically assume a European class unless they have been tested and classified accordingly. 2. When assessed as being capable of meeting a performance classification, products or systems should follow the relevant test standards to indicate their fire resistance performance in terms of loadbearing capacity, integrity or insulation for a period of minutes, when following the recommendations of paragraphs B1 to B5. 3. Applies to loadbearing elements only (see paragraph B18). 4. Guidance on increasing the fire resistance of existing timber floors is given in BRE Digest 208. 5. Only if a suspended ceiling meets the appropriate provisions should it be relied on to add to the fire resistance of the floor. 6. Such walls may contain areas that do not need to be fire resisting (unprotected areas). See Section 11. 7. Unless needed as part of a wall in item 5a or 5b. 8. Except for any limitations on uninsulated glazed elements given in Table B3.
Page 12
#Source page 12
| Purpose group of building | Basement storey: depth more than 10 m | Basement storey: depth up to 10 m | Ground or upper storey: height up to 5 m | Ground or upper storey: height up to 11 m | Ground or upper storey: height up to 18 m | Ground or upper storey: height up to 30 m | Ground or upper storey: height more than 30 m |
|---|---|---|---|---|---|---|---|
| 1. Residential: a. Block of flats – without sprinkler system | 90 min | 60 min | 30 min† | 60 min‡§ | Not permitted⁽²⁾ | Not permitted⁽²⁾ | Not permitted⁽²⁾ |
| 1. Residential: a. Block of flats – with sprinkler system⁽³⁾ | 90 min | 60 min | 30 min† | 60 min‡§ | 60 min‡§ | 90 min‡ | 120 min‡ |
| 1. Residential: b. and c. Dwellinghouse | Not applicable⁽⁴⁾ | 30 min*† | 30 min† | 60 min⁽⁵⁾ | 60 min⁽⁵⁾ | Not applicable⁽⁴⁾ | Not applicable⁽⁴⁾ |
| 2. Residential a. Institutional | 90 min | 60 min | 30 min† | 60 min | 60 min | 90 min | 120 min† |
| 2. Residential b. Other residential | 90 min | 60 min | 30 min† | 60 min | 60 min | 90 min | 120 min† |
| 3. Office – without sprinkler system | 90 min | 60 min | 30 min† | 60 min | 60 min | 90 min | Not permitted⁽⁶⁾ |
| 3. Office – with sprinkler system⁽³⁾ | 60 min | 60 min | 30 min† | 30 min† | 30 min† | 60 min | 120 min† |
| 4. Shop and commercial – without sprinkler system | 90 min | 60 min | 60 min | 60 min | 60 min | 90 min | Not permitted⁽⁶⁾ |
| 4. Shop and commercial – with sprinkler system⁽³⁾ | 60 min | 60 min | 30 min† | 60 min | 60 min | 60 min | 120 min† |
| 5. Assembly and recreation – without sprinkler system | 90 min | 60 min | 60 min | 60 min | 60 min | 90 min | Not permitted⁽⁶⁾ |
| 5. Assembly and recreation – with sprinkler system⁽³⁾ | 60 min | 60 min | 30 min† | 60 min | 60 min | 60 min | 120 min† |
| 6. Industrial – without sprinkler system | 120 min | 90 min | 60 min | 90 min | 90 min | 120 min | Not permitted⁽⁶⁾ |
| 6. Industrial – with sprinkler system⁽³⁾ | 90 min | 60 min | 30 min† | 60 min | 60 min | 90 min | 120 min† |
| 7. Storage and other non-residential: a. any building or part not described elsewhere – without sprinkler system | 120 min | 90 min | 60 min | 90 min | 90 min | 120 min | Not permitted⁽⁶⁾ |
| 7. Storage and other non-residential: a. any building or part not described elsewhere – with sprinkler system⁽³⁾ | 90 min | 60 min | 30 min† | 60 min | 60 min | 90 min | 120 min† |
Minimum periods of fire resistance⁽¹⁾ (minutes) in a: basement storey including floor over; ground or upper storey.
† See Table B3.
‡ See paragraph B3.
§ See paragraph B4.
Page 13
#Source page 13
| Purpose group of building | Basement storey* including floor over — Depth (m) of the lowest basement: More than 10 | Basement storey* including floor over — Depth (m) of the lowest basement: Up to 10 | Ground or upper storey — Height (m) of top floor above ground, in a building or separated part of a building: Up to 5 | Ground or upper storey — Height (m) of top floor above ground, in a building or separated part of a building: Up to 11 | Ground or upper storey — Height (m) of top floor above ground, in a building or separated part of a building: Up to 18 | Ground or upper storey — Height (m) of top floor above ground, in a building or separated part of a building: Up to 30 | Ground or upper storey — Height (m) of top floor above ground, in a building or separated part of a building: More than 30 |
|---|---|---|---|---|---|---|---|
| b. car park for light vehicles: i. open sided car park(7) | Not applicable | Not applicable | 15 min†# | 15 min†#(8) | 15 min†#(8) | 15 min†#(8) | 60 min |
| ii. any other car park | 90 min | 60 min | 30 min† | 60 min | 60 min | 90 min | 120 min‡ |
For single storey buildings, the periods under the heading ‘Up to 5’ apply. If single storey buildings have basements, for the basement storeys the period appropriate to their depth applies.
* For the floor over a basement or, if there is more than one basement, the floor over the topmost basement, the higher of the period for the basement storey and the period for the ground or upper storey applies.
† For compartment walls that separate buildings, the period is increased to a minimum of 60 minutes.
+ For any floor that does not contribute to the support of the building within a flat of more than one storey, the period is reduced to 30 minutes.
§ For flat conversions, refer to paragraphs 6.5 to 6.7 regarding the acceptability of 30 minutes.
‡ For elements that do not form part of the structural frame, the period is reduced to 90 minutes.
# For elements that protect the means of escape, the period is increased to 30 minutes.
1. Refer to note 1, Table B1 for the specific provisions of test.
2. Blocks of flats with a top storey more than 11m above ground level (see Diagram D6) should be fitted with a sprinkler system in accordance with Appendix E. NOTE: Sprinklers should be provided within the individual flats, they do not need to be provided in the common areas such as stairs, corridors or landings when these areas are fire sterile.
3. ‘With sprinkler system’ means that the building is fitted throughout with an automatic sprinkler system in accordance with Appendix E.
4. Very large (with a top storey more than 18m above ground level or with a 10m deep basement) or unusual dwellinghouses are outside the scope of the guidance provided with regard to dwellinghouses.
5. A minimum of 30 minutes in the case of three storey dwellinghouses, increased to 60 minutes minimum for compartment walls separating buildings.
6. Buildings within the ‘office’, ‘shop and commercial’, ‘assembly and recreation’, ‘industrial’ and ‘storage and other non-residential’ (except car parks for light vehicles) purpose groups (purpose groups 3 to 7(a)) require sprinklers where there is a top storey more than 30m above ground level.
7. The car park should comply with the relevant provisions in the guidance on requirement B3, Section 1 of Approved Document B Volume 2.
8. For the purposes of meeting the Building Regulations, the following types of steel elements are deemed to have satisfied the minimum period of fire resistance of 15 minutes when tested to the European test method. i. Beams supporting concrete floors, maximum Hp/A=230m⁻¹ operating under full design load. ii. Free-standing columns, maximum Hp/A=180m⁻¹ operating under full design load. iii. Wind bracing and struts, maximum Hp/A=210m⁻¹ operating under full design load. Guidance is also available in BS EN 1993-1-2.
Application of the fire resistance standards in Table B2
#Source page 14
B26The following guidance should be used when applying the fire resistance standards in Table B2.
a.If one element of structure supports or carries or gives stability to another, the fire resistance of the supporting element should be no less than the minimum period of fire resistance for the other element (whether that other element is loadbearing or not). In some circumstances, it may be reasonable to vary this principle, for example:
i.if the supporting structure is in the open air and is not likely to be affected by the fire in the building
ii.if the supporting structure is in a different compartment, with a fire-separating element (that has the higher standard of fire resistance) between the supporting and the separated structure
iii.if a plant room on the roof needs greater fire resistance than the elements of structure that support it.
b.If an element of structure forms part of more than one building or compartment, that element should be constructed to the standard of the higher of the relevant provisions.
c.If, due to the slope of the ground, one side of a basement is open at ground level (allowing smoke to vent and providing access for firefighting) for elements of structure in that storey it may be appropriate to adopt the standard of fire resistance that applies to above-ground structures.
d.Although most elements of structure in a single storey building may not need fire resistance, fire resistance is needed if one of the following applies to the element.
i.It is part of, or supports, an external wall, and there is provision in the guidance on requirement B4 to limit the extent of openings and other unprotected areas in the wall.
ii.It is part of, or supports, a compartment wall, including a wall that is common to two or more buildings.
iii.It supports a gallery.
B27For the purposes of this paragraph, the ground storey of a building that has one or more basement storeys and no upper storeys may be considered as a single storey building. The fire resistance of the basement storeys should be that specified for basements.
Page 15
#Source page 15
| Position of glazed element | A single stair — Walls | A single stair — Door leaf | More than one stair — Walls | More than one stair — Door leaf |
|---|---|---|---|---|
| Flats 1. Within the enclosures of a protected entrance hall or protected landing, or within fire resisting separation shown in Section 3, Diagram 3.4. | Fixed fanlights only | Unlimited above 1100mm from floor | Fixed fanlights only | Unlimited above 1100mm from floor |
| Dwellinghouses 2. Within either: a. the enclosures of a protected stairway b. fire resisting separation shown in Diagram 2.2. | Unlimited above 1100mm from floor or pitch of the stair | Unlimited | Unlimited above 1100mm from floor or pitch of the stair | Unlimited |
| 3. Within fire resisting separation either: a. shown in Diagram 2.4 b. described in paragraph 2.16b. | Unlimited above 100mm from floor | Unlimited above 100mm from floor | Unlimited above 100mm from floor | Unlimited above 100mm from floor |
| 4. Existing window between an attached/integral garage and the dwellinghouse. | Unlimited | Not applicable | Unlimited | Not applicable |
| 5. Adjacent to an external escape stair (see paragraph 2.17 and Diagram 2.7) or roof escape route (see paragraph 2.13). | Unlimited | Unlimited | Unlimited | Unlimited |
| General (except dwellinghouses) 6. Between residential/sleeping accommodation and a common escape route (corridor, lobby or stair). | Nil | Nil | Nil | Nil |
| 7. Between a protected stairway(1) and either: a. the accommodation b. a corridor that is not a protected corridor other than in item 6 above. | Nil | 25% of door area | Unlimited above 1100mm(2) | 50% of door area |
| 8. Between either: a. a protected stairway(1) and a protected lobby or protected corridor b. accommodation and a protected lobby other than in item 6 above. | Unlimited above 1100mm from floor | Unlimited above 100mm from floor | Unlimited above 100mm from floor | Unlimited above 100mm from floor |
| 9. Between the accommodation and a protected corridor that forms a dead end, other than in item 6 above. | Unlimited above 1100mm from floor | Unlimited above 100mm from floor | Unlimited above 1100mm from floor | Unlimited above 100mm from floor |
| 10. Between accommodation and any other corridor, or sub-dividing corridors, other than in item 6 above. | Not applicable | Not applicable | Unlimited above 100mm from floor | Unlimited above 100mm from floor |
| 11. Beside an external escape route. | Unlimited above 1100mm from floor | Unlimited above 1100mm from floor | Unlimited above 1100mm from floor | Unlimited above 1100mm from floor |
Appendix C: Fire doorsets
#Source page 16
| Position of glazed element | A single stair — Walls | A single stair — Door leaf | More than one stair — Walls | More than one stair — Door leaf |
|---|---|---|---|---|
| 12. Beside an external escape stair (see paragraph 3.68 and Diagram 3.11) or roof escape route (see paragraph 3.30). | Unlimited | Unlimited | Unlimited | Unlimited |
Items 1 and 8 apply also to single storey buildings.
Fire resisting glass should be marked with the name of the manufacturer and the name of the product.
Further guidance can be found in A Guide to Best Practice in the Specification and Use of Fire-resistant Glazed Systems published by the Glass and Glazing Federation.
1. If the protected stairway is also a protected shaft or a firefighting stair (see Section 15), there may be further restrictions on the use of glazed elements.
2. Measured vertically from the landing floor level or the stair pitch line.
3. The 100mm limit is intended to reduce the risk of fire spreading from a floor covering.
Appendix C: Fire doorsets
Pages 136 to 139Replace the whole of Appendix C: Fire doorsets with the following.
C1All fire doorsets should have the performance shown in Table C1, based on one of the following.
a.Fire doorsets should be classified in accordance with BS EN 13501-2, as determined with reference to Commission Decision 2000/367/EC regarding the classification of the resistance to fire performance of construction products, construction works and parts thereof, when tested to the relevant European method from the following.
i.BS EN 1634-1.
ii.BS EN 1634-2.
iii.BS EN 1634-3.
b.Fire doorsets may have their performance on fire resistance assessed, following the recommendations of paragraphs B1 to B5, as being capable of meeting a performance classification. In those situations the performance classifications given in Table C1 may be used, presented in terms of integrity, for a period of minutes, when tested to a relevant standard.
c.As determined with reference to European Parliament and Council Directive 95/16/EC (which applies to lifts that permanently serve buildings and constructions and specified safety components) on the approximation of laws of Member States relating to lifts (‘Lifts Directive’) implementing the Lifts Regulations 1997 (SI 1997/831) and calling upon the harmonised standard BS EN 81-58.
Page 17
#Source page 17
C2The performance requirement is in terms of integrity (E) for a period of minutes. An additional classification of Sₐ is used for all doors where restricted smoke leakage at ambient temperatures is needed.
C3The requirement is for test exposure from each side of the doorset separately. The exception is lift doors, which are tested from the landing side only.
C4Any test evidence used to verify the fire resistance rating of a doorset or shutter should be checked to ensure both of the following.
a.It adequately demonstrates compliance.
b.It is applicable to the complete installed assembly. Small differences in detail might significantly affect the rating and should be tested or assessed in accordance with paragraphs B1 to B5.
Until relevant harmonised product standards are published, for the purposes of meeting the Building Regulations, products or systems tested in accordance with BS EN 1634-1 (with or without pre-fire test mechanical conditioning) or assessed as being capable of meeting a performance classification based on the recommendations of paragraphs B1 to B5 that achieve the minimum performance in Table C1 will be deemed to satisfy the provisions.
C5All fire doorsets, including to flat entrances and between a dwellinghouse and an integral garage, should be fitted with a self-closing device, except for all of the following.
a.Fire doorsets to cupboards.
b.Fire doorsets to service ducts normally locked shut.
c.Fire doorsets within flats and dwellinghouses.
C6If a self-closing device would be considered to interfere with the normal approved use of the building, self-closing fire doors may be held open by one of the following.
a.A fusible link, but not if the doorset is in an opening provided as a means of escape unless it complies with paragraph C7.
b.An automatic release mechanism activated by an automatic fire detection and alarm system.
c.A door closer delay device.
C7Two fire doorsets may be fitted in the same opening if each door is capable of closing the opening, so the total fire resistance is the sum of their individual resistances. If the opening is provided as a means of escape, both fire doorsets should be self-closing.
If one fire doorset is capable of being easily opened by hand and has a minimum of 30 minutes’ fire resistance, the other fire doorset should comply with both of the following.
a.Be fitted with an automatic self-closing device.
b.Be held open by a fusible link.
Page 18
#Source page 18
C8Fire doorsets often do not provide any significant insulation. Unless providing both integrity and insulation in accordance with Appendix B, Table B1, a maximum of 25% of the length of a compartment wall should consist of door openings.
Where it is practicable to maintain a clear space on both sides of the doorway, the above percentage may be greater.
C9Rolling shutters should be capable of manual opening and closing for firefighting purposes (see Section 15). Rolling shutters across a means of escape should only be released by a heat sensor, such as a fusible link or electric heat detector, in the immediate vicinity of the door.
Unless a shutter is also intended to partially descend as part of a boundary to a smoke reservoir, shutters across a means of escape should not be closed by smoke detectors or a fire alarm system.
C10Unless shown to be satisfactory when tested as part of a fire doorset assembly, the essential components of any hinge on which a fire door is hung should be made entirely from materials that have a minimum melting point of 800°C.
C11Except for doorsets listed in paragraph C12, all fire doorsets should be marked with one of the following fire safety signs, complying with BS 5499-5, as appropriate.
a.To be kept closed when not in use – mark ‘Fire door keep shut’.
b.To be kept locked when not in use – mark ‘Fire door keep locked shut’.
c.Held open by an automatic release mechanism or free swing device – mark ‘Automatic fire door keep clear’.
C12The following fire doorsets are not required to comply with paragraph C11.
a.Doors to and within flats and dwellinghouses.
b.Bedroom doors in ‘residential (other)’ (purpose group 2(b)) premises.
c.Lift entrance/landing doors.
C13The performance of some doorsets set out in Table C1 is linked to the minimum periods of fire resistance for elements of structure given in Tables B1 and B2. Limitations on the use of uninsulated glazing in fire doorsets are given in Table B3.
C14Recommendations for the specification, design, construction, installation and maintenance of fire doorsets constructed with non-metallic door leaves are given in BS 8214.
Guidance on timber fire resisting doorsets, in relation to the new European test standard, may be found in Timber Fire Resisting Doorsets: Maintaining Performance Under the New European Test Standard published by the Timber Research and Development Association (TRADA).
Guidance for metal doors is given in Code of Practice for Fire Resisting Metal Doorsets published by the Door and Shutter Manufacturers’ Association (DSMA).
C15Hardware used on fire doors can significantly affect their performance in a fire. Notwithstanding the guidance in this approved document, guidance is available in Hardware for Fire and Escape Doors published by the Door and Hardware Federation (DHF) and Guild of Architectural Ironmongers (GAI).
Page 19
#Source page 19
| Position of doorset | Minimum fire resistance of doorset in terms of integrity (minutes) when tested and classified to the relevant European standard(1) or assessed following the recommendations of paragraph B1 to B5 and C1(2) |
|---|---|
| 1. In a compartment wall separating buildings | Same as for the wall in which the door is fitted, but a minimum of 60 minutes |
| 2. In a compartment wall: a. if it separates a flat from a space in common use | 30 minutes Sₐ(3) |
| 2. In a compartment wall: b. enclosing a protected shaft forming a stairway or an evacuation shaft wholly or partly above the adjoining ground in a building used for flats, other residential, assembly and recreation, or office purposes | 30 minutes Sₐ(3) |
| 2. In a compartment wall: c. enclosing a protected shaft forming a stairway or an evacuation shaft not described in (b) above | Half the period of fire resistance of the wall in which it is fitted, but 30 minutes minimum and with suffix Sₐ(3) |
| 2. In a compartment wall: d. enclosing a protected shaft forming a lift or service shaft | Half the period of fire resistance of the wall in which it is fitted, but 30 minutes minimum |
| 2. In a compartment wall: e. not described in (a), (b), (c) or (d) above. | Same as for the wall in which it is fitted, but add Sₐ(3) if the door is used for progressive horizontal evacuation under the guidance to requirement B1 |
| 3. In a compartment floor | Same as for the floor in which it is fitted |
| 4. Forming part of the enclosures of: a. a protected stairway or evacuation shaft (except as described in item 9 or 11(b) below) | 30 minutes Sₐ(3) |
| 4. Forming part of the enclosures of: b. a lift shaft (see paragraph 3.99b) that does not form a protected shaft in 2(b), (c) or (d) above. | 30 minutes |
| 5. Forming part of the enclosure of: a. a protected lobby approach (or protected corridor) to a stairway or an evacuation shaft. | 30 minutes Sₐ(3) |
| 5. Forming part of the enclosure of: b. any other protected corridor | 20 minutes Sₐ(3) |
| 5. Forming part of the enclosure of: c. a protected lobby approach to a lift shaft (paragraphs 3.102 to 3.104). | 30 minutes Sₐ(3) |
| 6. Giving access to an external escape route | 30 minutes |
| 7. Sub-dividing: a. corridors connecting alternative exits | 20 minutes Sₐ(3) |
| 7. Sub-dividing: b. dead-end portions of corridors from the remainder of the corridor. | 20 minutes Sₐ(3) |
| 8. Any door within a cavity barrier | 30 minutes |
| 9. Any door that forms part of the enclosure to a protected entrance hall or protected landing in a flat | 20 minutes |
| 10. Any door that forms part of the enclosure: a. to a place of special fire hazard | 30 minutes |
| 10. Any door that forms part of the enclosure: b. to ancillary accommodation in care homes (see paragraph 2.44 in Approved Document B Volume 2). | 30 minutes |
Appendix F: Standards referred to
#Source page 20
| Position of doorset | Minimum fire resistance of doorset in terms of integrity (minutes) when tested and classified to the relevant European standard(1) or assessed following the recommendations of paragraph B1 to B5 and C1(2) |
|---|---|
| 11. In a dwellinghouse: a. between a dwellinghouse and a garage | 30 minutes Sₐ(3) |
| 11. In a dwellinghouse: b. forming part of the enclosures to a protected stairway in a single family dwellinghouse | 20 minutes |
| 11. In a dwellinghouse: c. within any fire resisting construction in a dwellinghouse not described elsewhere in this table. | 20 minutes |
1. Classified in accordance with BS EN 13501-2. In the European classification ‘E’ is the resistance to fire in terms of integrity. Products or systems cannot typically assume a European class unless they have been tested and classified accordingly.
2. When assessed as being capable of meeting a performance classification, products or systems should follow the relevant test standards to indicate their fire resistance performance in terms of integrity for a period of minutes, when following the recommendations of paragraphs B1 to B5.
3. Unless pressurisation techniques that comply with BS EN 12101-6 are used, these doors should also be evidenced to match in performance the additional Sₐ classification when tested to BS EN 1634-3.
Appendix F: Standards referred to
British standards
Page 150Delete the section on BS 476 Fire tests on building materials and structures.
Appendix G: Documents referred to
Other documents
Association for Specialist Fire Protection (ASFP)
Page 152Delete the following publication.
ASFP Blue Book British Standard version – Fire Resisting Ductwork, Tested to BS 476 Part 24, Third Edition.
Index
Page 155In the index entry for British standards, delete the following sub-entries.
•BS 476-20 to 21 Table B3
•BS 476-22 Table B3, Appendix C1, Table C1
•BS 476-23 to 24 Table B3
•BS 476-31.1 Table C1
The Building Regulations 2010
#Source page 21
Approved Document B: Fire safety
Volume 2 – Buildings other than dwellings
2019 edition incorporating the 2020, 2022, 2025 and 2026 amendments
List of amendments
Taking effect on 2 September 2029
Appendix B: Performance of materials, products and structures
Replace the whole of Appendix B: Performance of materials, products and structures with the following.
Introduction
B1The guidance in this document is given in terms of performance classifications in relation to European Standards. In such cases, it will be necessary to demonstrate that a system or product can meet the relevant performance classification. This will be achieved if the system or product complies with one of the following.
a.They should be in accordance with a specification or design that has been shown by specific test(s) to be capable of meeting that performance classification.
b.They should have been designed by using relevant design standards in order to meet that performance classification.
c.They should have been assessed by applying relevant test evidence, in lieu of carrying out a specific test, as being capable of meeting that performance classification.
B2Any test evidence used to demonstrate the fire performance classification of a product or system should be carefully checked to ensure that it is applicable to the intended use. Small differences in detail, such as fixing method, joints, dimensions, the introduction of insulation materials and air gaps (ventilated or not), might significantly affect the performance and should be tested or assessed in accordance with paragraph B1.
Reaction to fire
#Source page 22
B3Assessments should not be regarded as a way to avoid a test where one is necessary. Assessments should only be carried out where sufficient relevant test evidence is available. Relevant test evidence is unlikely to be provided by test standards which have different classification criteria.
B4Where it is proposed to assess the classification of a product or system in lieu of carrying out a specific test (as in paragraph B1c), this should be done in accordance with the relevant standard for extended application for the test in question and should include details of the test evidence that has been used to support the assessment.
For performance classifications where there is no specific standard for extended application, assessment reports should be produced in accordance with the principles of BS EN 15725 and should include details of the test evidence that has been used to support the assessment. In cases where the end use application is not covered by the extended application standard and an assessment is the only other suitable approach, then further information on best practice is provided in the Passive Fire Protection Forum’s Guide to Undertaking Technical Assessments of the Fire Performance of Construction Products Based on Fire Test Evidence. The same principle should be followed for assessments as described in paragraph B2.
B5Tests and assessments should be carried out by organisations with the necessary expertise. For example, organisations listed as ‘notified bodies’ in accordance with the European Construction Products Regulation or laboratories accredited by the United Kingdom Accreditation Service (UKAS) for the relevant test standard can be assumed to have the necessary expertise.
Reaction to fire
B6Reaction to fire relates to the degree to which a product will contribute, by its own decomposition, to a fire under specified conditions. Products, other than floorings, are classified as A1, A2, B, C, D, E or F (with class A1 being the highest performance and F being the lowest) in accordance with BS EN 13501-1. Class F is assigned when a product fails to attain class E. Untested products cannot be classified in accordance with BS EN 13501-1.
Materials covered by the Classification Without Further Testing (CWFT) process can be found by accessing the European Commission’s website https://eur-lex.europa.eu/.
B7The classes of reaction to fire performance of A2, B, C, D and E are accompanied by additional classifications related to the production of smoke (s1, s2, s3), with s1 indicating the lowest production, and/or flaming droplets/particles (d0, d1, d2), with d0 indicating the lowest production.
Thermoplastic materials
#Source page 23
B8To reduce the testing burden on manufacturers, BS EN 13238 defines a number of standard substrates that produce test results representative of different end use applications. The classification for reaction to fire achieved during testing is only valid when the product is used within this direct field of application, i.e. when the product is fixed to a substrate of that class in its end use. The standard substrate selected for testing should take account of the intended end use applications (field of application) of the product and represent end use substrates that have a density of a minimum of 75% of the standard substrate’s nominal density.
B9Standard substrates include gypsum plasterboard (BS EN 520) with a density of 700+/-100kg/m³, calcium silicate board (BS EN 14306) 870+/-50kg/m³ and fibre-cement board 1800+/-200kg/m³.
Thermoplastic materials
B10Thermoplastic material is any synthetic polymeric material that has a softening point below 200°C if tested to BS EN ISO 306 Method A120. Products formed from these materials cannot always be classified in the normal way. In those circumstances the following approach can be followed.
B11Thermoplastic materials used for window glazing, rooflights and lighting diffusers within suspended ceilings do not need to meet the criteria within paragraph B18 onwards, if the guidance to requirements B2 and B4 is followed.
B12For the purposes of requirements B2 and B4 thermoplastic materials should be classified as TP(a) rigid, TP(a) flexible or TP(b), as follows:
a.TP(a) rigid
i.rigid solid uPVC sheet
ii.solid (as distinct from double- or multi-skinned) polycarbonate sheet a minimum of 3mm thick
iii.any other rigid thermoplastic product, a specimen of which (at the thickness of the product as put on the market), when tested to BS 2782-0 Method 508A, performs so that both:
•the test flame extinguishes before the first mark
•the duration of flaming or afterglow does not exceed 5 seconds following removal of the burner.
Roofs
#Source page 24
b.TP(a) flexible
Flexible products a maximum of 1mm thick that comply with the Type C requirements of BS 5867-2 when tested to BS 5438 Test 2 with the flame applied to the surface of the specimens for 5, 15, 20 and 30 seconds respectively, but excluding the cleansing procedure; and
c.TP(b)
i.rigid solid polycarbonate sheet products a maximum of 3mm thick, or multi-skinned polycarbonate sheet products that do not qualify as TP(a) by test
ii.other products which, when a specimen of the material between 1.5 and 3mm thick is tested in accordance with BS 2782-0 Method 508A, have a maximum rate of burning of 50mm/minute.
B13A thermoplastic material alone when used as a lining to a wall or ceiling cannot be assumed to protect a substrate. The surface rating of both thermoplastic material and substrate must therefore meet the required classification.
If, however, the thermoplastic material is fully bonded to a non-thermoplastic substrate, then only the surface rating of the composite needs to meet the required classification.
Roofs
B14Performance of the resistance of roofs to external fire exposure is measured in terms of penetration through the roof construction and the spread of flame over its surface.
B15Roof constructions are classified within the European system as BROOF(t4), CROOF(t4), DROOF(t4), EROOF(t4) or FROOF(t4) in accordance with **BS EN 13501-5**. BROOF(t4) indicates the highest performance and F_ROOF(t4) the lowest.
B16BS EN 13501-5 refers to four separate roof tests. The suffix (t4) used in paragraph B15 indicates that Test 4 is to be used for the purposes of this approved document.
B17This document uses the European classification system for roof covering set out in BS EN 13501-5; however, there may be some products or systems whose performance will need to be assessed based on the recommendations of paragraphs B1 to B5 as being capable of meeting that performance classification.
Fire resistance
B18Common to all of the provisions of Part B of the Building Regulations is the property of fire resistance. Fire resistance is a measure of one or more of the following criteria.
a.Resistance to collapse (loadbearing capacity), which applies to loadbearing elements only, denoted R in the European classification of the resistance to fire performance.
Page 25
#Source page 25
b.Resistance to fire penetration (integrity), denoted E in the European classification of the resistance to fire performance.
c.Resistance to the transfer of excessive heat (insulation), denoted I in the European classification of the resistance to fire performance.
B19The standards of fire resistance necessary for a particular building are based on assumptions about the severity of fires and the consequences should an element fail. Fire severity is estimated in very broad terms from the use of the building (its purpose group), on the assumption that the building contents (which constitute the fire load) are similar for buildings with the same use.
B20Because the use of buildings may change, a precise estimate of fire severity based on the fire load due to a particular use may be misleading. Therefore if a fire engineering approach of this kind is adopted, the likelihood that the fire load may change in the future needs to be considered.
B21Performance in terms of the fire resistance to be achieved by elements of structure, doors and other forms of construction is classified in accordance with one of the following.
a.BS EN 13501-2.
b.BS EN 13501-3.
c.BS EN 13501-4.
B22Fire resistance is measured in minutes. This relates to time elapsed in a standard test and should not be confused with real time.
B23The fire resistance necessary for different circumstances is set out in the following tables.
a.Table B1 gives the specific requirements for each element of structure.
b.Table B2 sets out the minimum periods of fire resistance for elements of structure.
c.Table B3 sets out limitations on the use of uninsulated fire resisting glazed elements.
B24This document uses the European classification system (REI) for fire resistance set out in BS EN 13501-2 to 4. Fire resistance is expressed as REI X, where X is the period of fire resistance in minutes in terms of loadbearing capacity (R), integrity (E) and insulation (I). Products or systems cannot typically assume a European class unless they have been tested and classified accordingly.
B25Products or systems achieving the European classification (REI) should be specified wherever possible. However, there may be some products or systems that have been assessed as being capable of meeting a fire resistance performance classification. When assessed, products or systems should follow the relevant test standards to indicate their fire resistance performance in terms of loadbearing capacity, integrity and insulation based on the recommendations of paragraphs B1 to B5. In those situations, the performance classifications given in Table B1 and Table B2 may be used.
Page 26
#Source page 26
| Part of building | Loadbearing capacity(3) | Integrity | Insulation | Type of exposure |
|---|---|---|---|---|
| 1. Structural frame, beam or column. | See Table B2 | Not applicable | Not applicable | Exposed faces |
| 2. Loadbearing wall (for a wall which is also described in any of the following items, the more onerous guidance should be applied). | See Table B2 | Not applicable | Not applicable | Each side separately |
| 3. Floors(4) — a. between a shop and flat above | 60 min or see Table B2 (whichever is greater) | 60 min or see Table B2 (whichever is greater) | 60 min or see Table B2 (whichever is greater) | From underside(5) |
| b. in upper storey of two storey dwellinghouse (but not over garage or basement) | 30 min | 15 min | 15 min | From underside (5) |
| c. any other floor – including compartment floors. | See Table B2 | See Table B2 | See Table B2 | From underside (5) |
| 4. Roofs — a. any part forming an escape route | 30 min | 30 min | 30 min | From underside (5) |
| b. any roof that performs the function of a floor. | See Table B2 | See Table B2 | See Table B2 | From underside (5) |
| 5. External walls — a. any part a maximum of 1000mm from any point on the relevant boundary(6) | See Table B2 | See Table B2 | See Table B2 | Each side separately |
| b. any part a minimum of 1000mm from the relevant boundary(6) | See Table B2 | See Table B2 | 15 min | From inside the building |
| c. any part beside an external escape route (Section 2, Diagram 2.7 of Approved Document B Volume 1 and Section 3, Diagram 3.4). | 30 min | 30 min | No provision(7) (8) | From inside the building |
Page 27
#Source page 27
| Part of building | Loadbearing capacity(3) | Integrity | Insulation | Type of exposure |
|---|---|---|---|---|
| 6. Compartment walls Separating either: a. a flat from any other part of the building (see paragraph 7.1 of Approved Document B Volume 1) | 60 min or see Table B2 (whichever is less) | 60 min or see Table B2 (whichever is less) | 60 min or see Table B2 (whichever is less) | Each side separately |
| b. occupancies. | 60 min or see Table B2 (whichever is less) | 60 min or see Table B2 (whichever is less) | 60 min or see Table B2 (whichever is less) | Each side separately |
| 7. Compartment walls (other than in item 6 or item 10). | See Table B2 | See Table B2 | See Table B2 | Each side separately |
| 8. Protected shafts Excluding any firefighting shaft: a. any glazing described in Section 8, Diagram 8.4 | Not applicable | 30 min | No provision(8) | Each side separately |
| b. any other part between the shaft and a protected lobby/corridor described in Section 8, Diagram 8.4 | 30 min | 30 min | 30 min | Each side separately |
| c. any part not described in (a) or (b) above. | See Table B2 | See Table B2 | See Table B2 | Each side separately |
| 9. Enclosure (that does not form part of a compartment wall or a protected shaft) to a: a. protected stairway | 30 min | 30 min | 30 min(8) | Each side separately |
| b. lift shaft. | 30 min | 30 min | 30 min | Each side separately |
| 10. Wall or floor separating an attached or integral garage from a dwellinghouse | 30 min | 30 min | 30 min(8) | From garage side |
| 11. Fire resisting construction in dwellinghouses not described elsewhere | 30 min | 30 min | 30 min(8) | Each side separately |
| 12. Firefighting shafts | 120 min | 120 min | 120 min | From side remote from shaft |
| a. construction that separates firefighting shaft from rest of building | 60 min | 60 min | 60 min | From shaft side |
| b. construction that separates firefighting stair, firefighting lift shaft and firefighting lobby. | 60 min | 60 min | 60 min | Each side separately |
Page 28
#Source page 28
| Part of building | Loadbearing capacity(3) | Integrity | Insulation | Type of exposure |
|---|---|---|---|---|
| 13. Enclosure (that is not a compartment wall or described in item 8) to a: a. protected lobby | 30 min | 30 min | 30 min(8) | Each side separately |
| b. protected corridor. | 30 min | 30 min | 30 min(8) | Each side separately |
| 14. Sub-division of a corridor | 30 min | 30 min | 30 min(8) | Each side separately |
| 15. Fire resisting construction a. construction that encloses places of special fire hazard | 30 min | 30 min | 30 min | Each side separately |
| b. construction between store rooms and sales area in shops | 30 min | 30 min | 30 min | Each side separately |
| c. fire resisting sub-division | 30 min | 30 min | 30 min | Each side separately |
| d. construction that encloses bedrooms and ancillary accommodation in care homes. | 30 min | 30 min | 30 min | Each side separately |
| 16. Enclosure in a flat to a protected entrance hall, or to a protected landing. | 30 min | 30 min | 30 min(8) | Each side separately |
| 17. Cavity barrier | Not applicable | 30 min | 15 min | Each side separately |
| 18. Ceiling see see paragraph 2.5, Diagram 2.3 of Approved Document B Volume 1 and paragraph 9.5 and Diagram 9.3. | Not applicable | 30 min | 30 min | From underside |
| 19. Duct described in paragraph 9.17e. | Not applicable | 30 min | No provision | From outside |
| 20. Casing around a drainage system described in Diagram 9.1 of Approved Document B Volume 1. | Not applicable | 30 min | No provision | From outside |
| 21. Flue walls described in Diagram 10.4. | Not applicable | Half the period given in Table B2 for the compartment wall/floor | Half the period given in Table B2 for the compartment wall/floor | From outside |
| 22. Construction described in note (a) to paragraph 12.9 of Approved Document B Volume 1. | Not applicable | 30 min | 30 min | From underside |
Page 29
#Source page 29
| Part of building | Loadbearing capacity | Integrity | Insulation | Type of exposure |
|---|---|---|---|---|
| 23. Fire doorsets | See Table C1 | See Appendix C |
Minimum provisions when tested and classified to the relevant European standard (minutes) or assessed following the recommendations of paragraphs B1 to B5 (minutes).
Page 30
#Source page 30
| Purpose group of building | Basement storey, including floor over — depth (m) of the lowest basement: More than 10 | Basement storey, including floor over — depth (m) of the lowest basement: Up to 10 | Ground or upper storey — height (m) of top floor above ground, in a building or separated part of a building: Up to 5 | Ground or upper storey — Up to 11 | Ground or upper storey — Up to 18 | Ground or upper storey — Up to 30 | Ground or upper storey — More than 30 |
|---|---|---|---|---|---|---|---|
| 1. Residential: a. Block of flats – without sprinkler system | 90 min | 60 min | 30 min† | 60 min‡§ | Not permitted(2) | Not permitted(2) | Not permitted(2) |
| 1. Residential: a. Block of flats – with sprinkler system(3) | 90 min | 60 min | 30 min† | 60 min‡§ | 60 min‡§ | 90 min‡ | 120 min‡ |
| 1. Residential: b. and c. Dwellinghouse | Not applicable(4) | 30 min†* | 30 min† | 60 min(5) | 60 min(5) | Not applicable(4) | Not applicable(4) |
| 2. Residential a. Institutional | 90 min | 60 min | 30 min† | 60 min | 60 min | 90 min | 120 min† |
| 2. Residential b. Other residential | 90 min | 60 min | 30 min† | 60 min | 60 min | 90 min | 120 min† |
| 3. Office – without sprinkler system | 90 min | 60 min | 30 min† | 60 min | 60 min | 90 min | Not permitted(6) |
| 3. Office – with sprinkler system(3) | 60 min | 60 min | 30 min† | 30 min† | 30 min† | 60 min | 120 min† |
| 4. Shop and commercial – without sprinkler system | 90 min | 60 min | 60 min | 60 min | 60 min | 90 min | Not permitted(6) |
| 4. Shop and commercial – with sprinkler system(3) | 60 min | 60 min | 30 min† | 60 min | 60 min | 60 min | 120 min† |
| 5. Assembly and recreation – without sprinkler system | 90 min | 60 min | 60 min | 60 min | 60 min | 90 min | Not permitted(6) |
| 5. Assembly and recreation – with sprinkler system(3) | 60 min | 60 min | 30 min† | 60 min | 60 min | 60 min | 120 min† |
| 6. Industrial – without sprinkler system | 120 min | 90 min | 60 min | 90 min | 90 min | 120 min | Not permitted(6) |
| 6. Industrial – with sprinkler system(3) | 90 min | 60 min | 30 min† | 60 min | 60 min | 90 min | 120 min† |
| 7. Storage and other non-residential: a. any building or part not described elsewhere – without sprinkler system | 120 min | 90 min | 60 min | 90 min | 90 min | 120 min | Not permitted(6) |
| 7. Storage and other non-residential: a. any building or part not described elsewhere – with sprinkler system(3) | 90 min | 60 min | 30 min† | 60 min | 60 min | 90 min | 120 min† |
Minimum periods of fire resistance(1) (minutes) in a:
Page 31
#Source page 31
| Purpose group of building | Basement storey, including floor over — depth (m) of the lowest basement: More than 10 | Basement storey, including floor over — depth (m) of the lowest basement: Up to 10 | Ground or upper storey — height (m) of top floor above ground, in a building or separated part of a building: Up to 5 | Ground or upper storey — Up to 11 | Ground or upper storey — Up to 18 | Ground or upper storey — Up to 30 | Ground or upper storey — More than 30 |
|---|---|---|---|---|---|---|---|
| 7. Storage and other non-residential: b. car park for light vehicles: i. open sided car park(7) | Not applicable | Not applicable | 15 min†# | 15 min†#(8) | 15 min†#(8) | 15 min†#(8) | 60 min |
| 7. Storage and other non-residential: b. car park for light vehicles: ii. any other car park | 90 min | 60 min | 30 min† | 60 min | 60 min | 90 min | 120 min† |
Minimum periods of fire resistance(1) (minutes) in a:
Application of the fire resistance standards in Table B2
#Source page 32
B26The following guidance should be used when applying the fire resistance standards in Table B2.
a.If one element of structure supports or carries or gives stability to another, the fire resistance of the supporting element should be no less than the minimum period of fire resistance for the other element (whether that other element is loadbearing or not). In some circumstances, it may be reasonable to vary this principle, for example:
i.if the supporting structure is in the open air and is not likely to be affected by the fire in the building
ii.if the supporting structure is in a different compartment, with a fire-separating element (that has the higher standard of fire resistance) between the supporting and the separated structure
iii.if a plant room on the roof needs greater fire resistance than the elements of structure that support it.
b.If an element of structure forms part of more than one building or compartment, that element should be constructed to the standard of the higher of the relevant provisions.
c.If, due to the slope of the ground, one side of a basement is open at ground level (allowing smoke to vent and providing access for firefighting) for elements of structure in that storey it may be appropriate to adopt the standard of fire resistance that applies to above-ground structures.
d.Although most elements of structure in a single storey building may not need fire resistance, fire resistance is needed if one of the following applies to the element.
i.It is part of, or supports, an external wall, and there is provision in the guidance on requirement B4 to limit the extent of openings and other unprotected areas in the wall.
ii.It is part of, or supports, a compartment wall, including a wall that is common to two or more buildings.
iii.It supports a gallery.
B27For the purposes of this paragraph, the ground storey of a building that has one or more basement storeys and no upper storeys may be considered as a single storey building. The fire resistance of the basement storeys should be that specified for basements.
Page 33
#Source page 33
| Position of glazed element | A single stair – Walls | A single stair – Door leaf | More than one stair – Walls | More than one stair – Door leaf |
|---|---|---|---|---|
| Flats | ||||
| 1. Within the enclosures of a protected entrance hall or protected landing, or within fire resisting separation shown in Section 3, Diagram 3.4 of Approved Document B Volume 1. | Fixed fanlights only | Unlimited above 1100mm from floor | Fixed fanlights only | Unlimited above 1100mm from floor |
| Dwellinghouses | ||||
| 2. Within either: a. the enclosures of a protected stairway b. fire resisting separation shown in Diagram 2.2 of Approved Document B Volume 1. | Unlimited above 1100mm from floor or pitch of the stair | Unlimited | Unlimited above 1100mm from floor or pitch of the stair | Unlimited |
| 3. Within fire resisting separation either: a. shown in Diagram 2.4 of Approved Document B Volume 1 b. described in paragraph 2.16b of Approved Document B Volume 1. | Unlimited above 100mm from floor | Unlimited above 100mm from floor | Unlimited above 100mm from floor | Unlimited above 100mm from floor |
| 4. Existing window between an attached/integral garage and the dwellinghouse. | Unlimited | Not applicable | Unlimited | Not applicable |
| 5. Adjacent to an external escape stair (see paragraph 2.17 and Diagram 27 of Approved Document B Volume 1) or roof escape route (see paragraph 2.13 of Approved Document B Volume 1). | Unlimited | Unlimited | Unlimited | Unlimited |
| General (except dwellinghouses) | ||||
| 6. Between residential/sleeping accommodation and a common escape route (corridor, lobby or stair). | Nil | Nil | Nil | Nil |
| 7. Between a protected stairway(1) and either: a. the accommodation b. a corridor that is not a protected corridor other than in item 6 above. | Nil | 25% of door area | Unlimited above 1100mm(2) | 50% of door area |
| 8. Between either: a. a protected stairway(1) and a protected lobby or protected corridor b. accommodation and a protected lobby other than in item 6 above. | Unlimited above 1100mm from floor | Unlimited above 1100mm from floor | Unlimited above 1100mm from floor | Unlimited above 1100mm from floor |
| 9. Between the accommodation and a protected corridor that forms a dead end, other than in item 6 above. | Unlimited above 1100mm from floor | Unlimited above 1100mm from floor | Unlimited above 1100mm from floor | Unlimited above 1100mm from floor |
| 10. Between accommodation and any other corridor, or sub-dividing corridors, other than in item 6 above. | Not applicable | Not applicable | Unlimited above 100mm from floor | Unlimited above 100mm from floor |
Appendix C: Fire doorsets
#Source page 34
| Position of glazed element | A single stair – Walls | A single stair – Door leaf | More than one stair – Walls | More than one stair – Door leaf |
|---|---|---|---|---|
| 11. Beside an external escape route. | Unlimited above 1100mm from floor | Unlimited above 1100mm from floor | Unlimited above 1100mm from floor | Unlimited above 1100mm from floor |
| 12. Beside an external escape stair (see paragraph 3.32 and Diagram 3.4) or roof escape route (see paragraph 2.32). | Unlimited | Unlimited | Unlimited | Unlimited |
NOTES:
Items 1 and 8 apply also to single storey buildings.
Fire resisting glass should be marked with the name of the manufacturer and the name of the product.
Further guidance can be found in A Guide to Best Practice in the Specification and Use of Fire-resistant Glazed Systems published by the Glass and Glazing Federation.
1. If the protected stairway is also a protected shaft or a firefighting stair (see Section 17), there may be further restrictions on the use of glazed elements.
2. Measured vertically from the landing floor level or the stair pitch line.
3. The 100mm limit is intended to reduce the risk of fire spreading from a floor covering.
Appendix C: Fire doorsets
Replace the whole of Appendix C: Fire doorsets with the following.
C1All fire doorsets should have the performance shown in Table C1, based on one of the following.
a.Fire doorsets should be classified in accordance with BS EN 13501-2, as determined with reference to Commission Decision 2000/367/EC regarding the classification of the resistance to fire performance of construction products, construction works and parts thereof, when tested to the relevant European method from the following.
i.BS EN 1634-1.
ii.BS EN 1634-2.
iii.BS EN 1634-3.
b.Fire doorsets may have their performance on fire resistance assessed, following the recommendations of paragraphs B1 to B5, as being capable of meeting a performance classification. In those situations the performance classifications given in Table C1 may be used, presented in terms of integrity, for a period of minutes, when tested to a relevant standard.
c.As determined with reference to European Parliament and Council Directive 95/16/EC (which applies to lifts that permanently serve buildings and constructions and specified safety components) on the approximation of laws of Member States relating to lifts (‘Lifts Directive’) implementing the Lifts Regulations 1997 (SI 1997/831) and calling upon the harmonised standard BS EN 81-58.
Page 35
#Source page 35
C2The performance requirement is in terms of integrity (E) for a period of minutes. An additional classification of Sₐ is used for all doors where restricted smoke leakage at ambient temperatures is needed.
C3The requirement is for test exposure from each side of the doorset separately. The exception is lift doors, which are tested from the landing side only.
C4Any test evidence used to verify the fire resistance rating of a doorset or shutter should be checked to ensure both of the following.
a.It adequately demonstrates compliance.
b.It is applicable to the complete installed assembly. Small differences in detail might significantly affect the rating and should be tested or assessed in accordance with paragraphs B1 to B5.
Until relevant harmonised product standards are published, for the purposes of meeting the Building Regulations, products or systems tested in accordance with BS EN 1634-1 (with or without pre-fire test mechanical conditioning) or assessed as being capable of meeting a performance classification based on the recommendations of paragraphs B1 to B5 that achieve the minimum performance in Table C1 will be deemed to satisfy the provisions.
C5All fire doorsets, including to flat entrances and between a dwellinghouse and an integral garage, should be fitted with a self-closing device, except for all of the following.
a.Fire doorsets to cupboards.
b.Fire doorsets to service ducts normally locked shut.
c.Fire doorsets within flats and dwellinghouses.
C6If a self-closing device would be considered to interfere with the normal approved use of the building, self-closing fire doors may be held open by one of the following.
a.A fusible link, but not if the doorset is in an opening provided as a means of escape unless it complies with paragraph C7.
b.An automatic release mechanism activated by an automatic fire detection and alarm system.
c.A door closer delay device.
C7Two fire doorsets may be fitted in the same opening if each door is capable of closing the opening, so the total fire resistance is the sum of their individual resistances. If the opening is provided as a means of escape, both fire doorsets should be self-closing.
If one fire doorset is capable of being easily opened by hand and has a minimum of 30 minutes’ fire resistance, the other fire doorset should comply with both of the following.
a.Be fitted with an automatic self-closing device.
b.Be held open by a fusible link.
Page 36
#Source page 36
C8Fire doorsets often do not provide any significant insulation. Unless providing both integrity and insulation in accordance with Appendix B, Table B1, a maximum of 25% of the length of a compartment wall should consist of door openings.
Where it is practicable to maintain a clear space on both sides of the doorway, the above percentage may be greater.
C9Rolling shutters should be capable of manual opening and closing for firefighting purposes (see Section 17). Rolling shutters across a means of escape should only be released by a heat sensor, such as a fusible link or electric heat detector, in the immediate vicinity of the door.
Unless a shutter is also intended to partially descend as part of a boundary to a smoke reservoir, shutters across a means of escape should not be closed by smoke detectors or a fire alarm system.
C10Unless shown to be satisfactory when tested as part of a fire doorset assembly, the essential components of any hinge on which a fire door is hung should be made entirely from materials that have a minimum melting point of 800°C.
C11Except for doorsets listed in paragraph C12, all fire doorsets should be marked with one of the following fire safety signs, complying with BS 5499-5, as appropriate.
a.To be kept closed when not in use – mark ‘Fire door keep shut’.
b.To be kept locked when not in use – mark ‘Fire door keep locked shut’.
c.Held open by an automatic release mechanism or free swing device – mark ‘Automatic fire door keep clear’.
C12The following fire doorsets are not required to comply with paragraph C11.
a.Doors to and within flats and dwellinghouses.
b.Bedroom doors in ‘residential (other)’ (purpose group 2(b)) premises.
c.Lift entrance/landing doors.
C13The performance of some doorsets set out in Table C1 is linked to the minimum periods of fire resistance for elements of structure given in Tables B1 and B2. Limitations on the use of uninsulated glazing in fire doorsets are given in Table B3.
C14Recommendations for the specification, design, construction, installation and maintenance of fire doorsets constructed with non-metallic door leaves are given in BS 8214.
Guidance on timber fire resisting doorsets, in relation to the new European test standard, may be found in Timber Fire Resisting Doorsets: Maintaining Performance Under the New European Test Standard published by the Timber Research and Development Association (TRADA).
Guidance for metal doors is given in Code of Practice for Fire Resisting Metal Doorsets published by the Door and Shutter Manufacturers’ Association (DSMA).
C15Hardware used on fire doors can significantly affect their performance in a fire. Notwithstanding the guidance in this approved document, guidance is available in Hardware for Fire and Escape Doors published by the Door and Hardware Federation (DHF) and Guild of Architectural Ironmongers (GAI).
Page 37
#Source page 37
| Position of doorset | Minimum fire resistance of doorset in terms of integrity (minutes) when tested and classified to the relevant European standard(1) or assessed following the recommendations of paragraph B1 to B5 and C1(2) |
|---|---|
| 1. In a compartment wall separating buildings | Same as for the wall in which the door is fitted, but a minimum of 60 minutes |
| 2. In a compartment wall: | |
| a. if it separates a flat from a space in common use | 30 minutes Sₐ (3) |
| b. enclosing a protected shaft forming a stairway or an evacuation shaft wholly or partly above the adjoining ground in a building used for flats, other residential, assembly and recreation, or office purposes | 30 minutes Sₐ (3) |
| c. enclosing a protected shaft forming a stairway or an evacuation shaft not described in (b) above | Half the period of fire resistance of the wall in which it is fitted, but 30 minutes minimum and with suffix Sₐ (3) |
| d. enclosing a protected shaft forming a lift or service shaft | Half the period of fire resistance of the wall in which it is fitted, but 30 minutes minimum |
| e. not described in (a), (b), (c) or (d) above. | Same as for the wall in which it is fitted, but add Sₐ (3) if the door is used for progressive horizontal evacuation under the guidance to requirement B1 |
| 3. In a compartment floor | Same as for the floor in which it is fitted |
| 4. Forming part of the enclosures of: | |
| a. a protected stairway or evacuation shaft (except as described in item 9 or 11(b) below) | 30 minutes Sₐ (3) |
| b. a lift shaft (see paragraph 5.34b) that does not form a protected shaft in 2(b), (c) or (d) above. | 30 minutes |
| 5. Forming part of the enclosure of: | |
| a. a protected lobby approach (or protected corridor) to a stairway or an evacuation shaft. | 30 minutes Sₐ (3) |
| b. any other protected corridor | 20 minutes Sₐ (3) |
| c. a protected lobby approach to a lift shaft (paragraphs 5.37 to 5.39). | 30 minutes Sₐ (3) |
| 6. Giving access to an external escape route | 30 minutes |
| 7. Sub-dividing: | |
| a. corridors connecting alternative exits | 20 minutes Sₐ (3) |
| b. dead-end portions of corridors from the remainder of the corridor. | 20 minutes Sₐ (3) |
| 8. Any door within a cavity barrier | 30 minutes |
| 9. Any door that forms part of the enclosure to a protected entrance hall or protected landing in a flat | 20 minutes |
| 10. Any door that forms part of the enclosure: | |
| a. to a place of special fire hazard | 30 minutes |
| b. to ancillary accommodation in care homes (see paragraph 2.44). | 30 minutes |
Appendix F: Standards referred to
#Source page 38
| Position of doorset | Minimum fire resistance of doorset in terms of integrity (minutes) when tested and classified to the relevant European standard(1) or assessed following the recommendations of paragraph B1 to B5 and C1(2) |
|---|---|
| 11. In a dwellinghouse: | |
| a. between a dwellinghouse and a garage | 30 minutes Sₐ (3) |
| b. forming part of the enclosures to a protected stairway in a single family dwellinghouse | 20 minutes |
| c. within any fire resisting construction in a dwellinghouse not described elsewhere in this table. | 20 minutes |
1. Classified in accordance with BS EN 13501-2. In the European classification ‘E’ is the resistance to fire in terms of integrity. Products or systems cannot typically assume a European class unless they have been tested and classified accordingly.
2. When assessed as being capable of meeting a performance classification, products or systems should follow the relevant test standards to indicate their fire resistance performance in terms of integrity for a period of minutes, when following the recommendations of paragraphs B1 to B5.
3. Unless pressurisation techniques that comply with BS EN 12101-6 are used, these doors should also be evidenced to match in performance the additional Sₐ classification when tested to BS EN 1634-3.
Appendix F: Standards referred to
British standards
Page 165Delete the section on BS 476 Fire tests on building materials and structures.
Appendix G: Documents referred to
Other documents
Association for Specialist Fire Protection (ASFP)
Page 167Delete the following publication.
ASFP Blue Book British Standard version – Fire Resisting Ductwork. Tested to BS 476 Part 24, Third Edition.
Index
Page 170In the index entry for British standards, delete the following sub-entries.
•BS 476-20 to 24 Table B3
•BS 476-22 Appendix C1, Table C1
•BS 476-31.1 Table C1
List of Approved Documents
#Source page 39
The following documents have been published to give guidance on how to meet the Building Regulations. You can find the date of the edition approved by the Secretary of State at www.gov.uk.
Approved Document A Structure
Approved Document B Fire safety Volume 1: Dwellings
Approved Document B Fire safety Volume 2: Buildings other than dwellings
Approved Document C Site preparation and resistance to contaminants and moisture
Approved Document D Toxic substances
Approved Document E Resistance to the passage of sound
Approved Document F Ventilation Volume 1: Dwellings
Approved Document F Ventilation Volume 2: Buildings other than dwellings
Approved Document G Sanitation, hot water safety and water efficiency
Approved Document H Drainage and waste disposal
Approved Document J Combustion appliances and fuel storage systems
Approved Document K Protection from falling, collision and impact
Approved Document L Conservation of fuel and power Volume 1: Dwellings
Approved Document L Conservation of fuel and power Volume 2: Buildings other than dwellings
Approved Document M Access to and use of buildings Volume 1: Dwellings
Approved Document M Access to and use of buildings Volume 2: Buildings other than dwellings
Approved Document O Overheating
Approved Document P Electrical safety – Dwellings
Approved Document Q Security – Dwellings
Approved Document R Infrastructure for electronic communications Volume 1: Physical infrastructure and network connection for new dwellings
Approved Document R Infrastructure for electronic communications Volume 2: Physical infrastructure for high-speed electronic communications networks
Approved Document S Infrastructure for the charging of electric vehicles
Approved Document T Toilet accommodation
Approved Document 7 Materials and workmanship
Page 40
#Source page 40
The Building Regulations 2010, Approved Documents are available from:
RIBA Books Online: www.ribabooks.com Telephone: (0)207 307 5355 Email: sales@ribabooks.com
© Crown copyright, 2024
You may re-use this information (excluding logos) free of charge in any format or medium, under the terms of the Open Government Licence v3.
To view this licence, visit www.nationalarchives.gov.uk/doc/open-government-licence/version/3/ or write to the Information Policy Team, The National Archives, Kew, London TW9 4DU or email psi@nationalarchives.gsi.gov.uk.
Where we have identified any third-party copyright information, you will need to obtain permission from the copyright holders concerned. This publication is available for download at www.gov.uk.
Copyright in the typographical arrangement, excluding logos, of the cover and internal page layouts of this publication rests with the publisher.