England Approved Document A
Frequently asked questions
Library captured 10 September 2026 · Source updated 31 August 2013
Department for Communities and Local Government
#Source page 1
[Text illegible in supplied page image]
[Text illegible in supplied page image]
[Text illegible in supplied page image]
Page 2
#Source page 2
© Crown copyright, 2016
Copyright in the typographical arrangement rests with the Crown.
You may re-use this information (not including logos) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence, http://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/ or write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or email: psi@nationalarchives.gsi.gov.uk.
This document/publication is also available on our website at www.gov.uk/dclg
If you have any enquiries regarding this document/publication, complete the form at http://forms.communities.gov.uk/ or write to us at: Department for Communities and Local Government Fry Building 2 Marsham Street London SW1P 4DF Telephone: 030 3444 0000
For all our latest news and updates follow us on Twitter: https://twitter.com/CommunitiesUK
March 2016
ISBN: 978-1-4098-4803-5
Contents
#Source page 3
Timber sizes for floor joists 4
How do I go about applying for Building Regulations Consent in retrospect? 4
Single storey extension foundations 5
Can you tell me if a conservatory can be erected on top of a first floor extension? 5
This has happened on a property near us and consequently we have lost our privacy. 5
Timber sizes for floor joists
#Source page 4
Where can I obtain the timber sizes for floor joists and roofing members that are no longer directly contained in the current version of Approved Document A?
This information is contained in the guidance document published by the Timber Research and Development Association (TRADA) titled:- ‘Span tables for solid timber members in floors, ceilings and roofs (excluding trussed rafter roofs) for dwellings’, obtainable from: TRADA Technology Ltd, Chiltern House Stocking Lane Hughenden Valley High Wycombe Buckinghamshire HP14 4ND
Or alternatively technical guidance is given in British Standard BS 8103 Part 3 2009 ‘Structural design of low-rise buildings – Code of practice for timber floors and roofs for housing’, obtainable from: British Standards Institution 389 Chiswick High Road London W4 4AL
How do I go about applying for Building Regulations Consent in retrospect?
I have recently moved into a three bedroom house which has had a loft room constructed. Building Regulations Consent was not obtained before doing this work though we are informed that the works conform to the required standards. How do I go about applying for Building Regulations Consent in retrospect? I know that planning permission was not required.
You will need to contact your local authority Building Control office and apply for a Regularisation Certification for this 'unauthorised building work'. This could be very disruptive as some of the covered building work may need to be exposed, e.g. to verify the size of a steel beam or the spacing and size of floor joists.
What needs to be done to create a basement in an existing or new house?
Basements require both Planning Permission and Building Regulations approval whether constructed as part of a new property or as a retrofit to an existing property. You will need to consult your Local Authority Planning and Building Control offices
Page 5
#Source page 5
Page 6
#Source page 6