About Approved Document C

Approved Document C gives guidance on preparing a site and protecting a building from harmful ground conditions and moisture. It covers contaminated land, radon and other gases from the ground, and how floors, walls and roofs resist damp and weather.

What it covers

  • Clearing or treating unsuitable material on the site
  • Resistance to contaminants, including radon and other gases from the ground
  • Subsoil drainage
  • Floors and their resistance to ground moisture
  • Walls, including resistance to rain and condensation
  • Roofs and resistance to weather

Figures in the current edition