The AI Workspace for ‍Architects and Engineers

The all-in-one AI-native platform for project delivery, from design to construction.
Schedule a demo
Schedule a demo
s
s
g
u
z
d
d
g
s
r
Trusted by Architects at:

Your firm runs on 100+ tools.

It only needs one.

What insulation for a warm flat roof?
Use rigid PIR boards with tapered falls ≥ 1:40. Target U-value 0.18 W/m²K.
BS 6229:2018
Ask a follow-up...
e
b
AI Assistant
All the power of AI, with all the context of your practice.
Arrow right icon
e
b
Gmail
Avoice AI
Project
Reply
AI Agents
Build custom AI agents that connect your tools, automate multi-step tasks, and run on your schedule.
Arrow right icon
e
b
Ss_25_10_30 Fire-rated partitions
Ss_32_20_30 Waterproofing systems
Ss_25_10_65 Plasterboard drylining
Ss_25_30_27 Floor finishes and screeds
Ss_30_12_30 Door assemblies
Specifications
AI-generated specifications that cite the right standards, products, and clauses.
Arrow right icon
e
b
OFFICE 01 CORRIDOR OFFICE 02 WC RECEPTION
Quality Control
Specs, drawings, reports, proposals. Everything your firm produces is checked for errors, inconsistencies, and missing information automatically.
Arrow right icon
e
b
Product Status Revit
Knauf Fireboard
12.5mm fire-rated board
Preferred
R
Kingspan TR26
PIR flat roof insulation
Basis of Design
R
Sika Sarnafil TS-77
Single-ply membrane
Preferred
R
Equitone Tectiva
Fibre cement panel
Needs Review
Schedules & Quantities
Door schedules, finishes, FF&E, room data. Synced to your BIM model, updated when it changes.
Arrow right icon
e
b
Site Inspection Report
Project Elmswood School
Visit #12 — 11 Apr 2026
Ref 26-HP-041
Contractor Caldwell Construction
Observations
01 Fire stopping incomplete at corridor junctions Level 2 — penetrations through compartment walls not sealed Urgent
02 Waterproof membrane laps at roof parapet short by approx 80mm — does not meet min 150mm overlap Urgent
03 Drylining in Office 01 plumb checked — within tolerance, proceed with taping and jointing Note
04 Screed levels in Reception area measured — 3mm deviation from datum noted at grid line C4 Action
Custom Docs
Site reports, proposals, meeting minutes, certificates. Drop in your notes, get a finished document in your firm's format.
Arrow right icon
e
b

Knauf C Stud 70mm

Submittal S-041 · vs Spec Ss_25_10_30
4/5 Pass
Spec Requirement
Fire rating
EI 60 min
EI 60
Stud depth
70mm
70mm
Gauge
0.55mm min
0.55mm
Acoustic
Rw ≥ 45 dB
Rw 47 dB
Max height
≥ 3.6m
3.0m
Construction Administration
RFIs, shop drawings, material submittals, auto-reviewed.
Arrow right icon
E
Elmswood School
Ridgemont Developments
RIBA Stage 4
0 1 3 4 5 6 7
Recent Activity
Spec package issued — Internal Walls
2 hours ago
Submittal S-041 approved
Yesterday
RFI-019 response sent to contractor
2 days ago
e
b
Client Portal
A branded portal where clients track progress, review documents, and approve deliverables. No logins to explain, no PDFs to chase.
Arrow right icon
e
b
3 tasks created from site visit #12
Issue AI to contractor — fire stopping L2
AI generated Due 14 Apr
Urgent
Request membrane remediation method
AI generated Due 15 Apr
Urgent
Verify screed datum — grid line C4
AI generated Due 16 Apr
Action
Delay risk — waterproofing may impact electrical View
Project Management
Staff allocation, fee tracking, timesheets, and deadlines. AI flags what needs attention before you have to ask.
Arrow right icon
e
b
Parapet / Flat Roof Junction DET-07 · 1:5
600mm A Precast coping B Membrane turn-up C PIR insulation D Vapour control layer E RC deck slab F Single-ply membrane
Detail Library
Upload your drawing sets. AI extracts, tags, and catalogues every detail. Search by what it is, not where it's saved.
Arrow right icon
e
b
White Oak
Series 7
Fritz Hansen · Oak veneer
£485
ex. VAT
Material Library
Paste a URL, drop a datasheet, or add from past projects. AI catalogues everything and your whole team can find it instantly
Arrow right icon
e
b
3 tasks created from site visit #12 report
Issue AI to contractor — fire stopping L2
AI generated Due 14 Apr
Urgent
JH
Request membrane remediation method
AI generated Due 15 Apr
Urgent
KW
Verify screed datum — grid line C4
AI generated Due 16 Apr
Action
RP
Delay risk detected — waterproofing may impact electrical schedule View
Custom Libraries
Precedent images, lessons learned, cost benchmarks, site photos. Create any library with any structure.
Arrow right icon
Avoice 'levels the playing field'... allowing lean teams to maintain a level of rigour previously associated with much larger studios.
Beyond operational efficiency — it touches the very foundation upon which architecture is built.
Not every day you hear about new technology targeting the architectural industry.
Arrow right iconArrow right icon
Arrow right iconArrow right icon
Our Impact
Supporting architectural practice at scale
Avoice works with architecture firms of all sizes across the full project lifecycle
13 hr
saved/ user/wk
$25k
annual productivity gains
faster schedules, specs, and QA
z
z
z
z
i
i
z
z
From workload to workflow
Try the AI workspace built for architecture.