Specifications

Specification, done properly.

Draft, coordinate and issue a tender-ready CAWS or Uniclass specification from your drawings with the Avoice AI Spec Model.

Book a Demo
Concrete and glass civic library illuminated at dusk

Project information in. Coordinated specification out.

Specification Quality Index 2026

Would your last specification survive a dispute?

We graded 50 UK specifications. One in five went to tender with legally consequential errors.

Read the SQI 2026 report

Measured against real work

We built a model that scores 97 out of 100.

The average UK specification scored 66. Avoice is built to produce work that is complete, coordinated and ready for scrutiny.

97/100

Avoice AI Spec Model

Tested on three architectural briefs using the same grading method as the UK sample.

See the full report

Built for impact

The specification writer built for the age of AI.

A better, faster and more accurate specification. Written in hours, not weeks, and checked against your drawings before it leaves the office.

AI-Powered Spec Writing

Specs drafted from your project

Start from the drawings, schedules and decisions already made, not a blank page.

  • Coordinated, tender-ready specifications written from your drawings, schedules and brief
  • Built on a model fine-tuned specifically for specification writing
  • Open items flagged as TBCs with reasons, never guessed or buried in prose
Rainscreen cladding systemsSs_25_13_60 Uniclass 2015
Northgate Academy — Specification
2.1
Rainscreen system: Rockpanel FS-Xtra, mechanically fixed to aluminium T&L rail, open drained and back-ventilated.
SystemsPr_25_57_06
2.2
Panel: mineral-filled composite, 4 mm, PVDF finish to BS EN 1396.
Systems
3.1
Reaction to fire: Class A2-s1, d0 to BS EN 13501-1.
PerformanceReg 7
3.2
Wind loading to BS EN 1991-1-4, exposure Category II; deflection ≤ span/180.
Performance
4.1
Set out joints from datum lines on the elevation drawing series. Install in accordance with manufacturer instructions. Do not scale.
ExecutionNo room refs
5.1
Submit installer certification and cavity barrier record before completion.
Completion

Sources & Compliance

Every clause traceable to its source

  • Clauses cite the Approved Documents, legislation and guidance behind them
  • Checked against your drawings for conflicts, orphan references and leftover content
  • A TBC register to clear before issue, so nothing reaches tender unresolved
Explore sources and compliance

Practice Voice

Your masters, your way of writing

  • Learns from your practice masters, clause library and past specs
  • Upload your own contract and prelims are drafted to match it
  • Every project reads like your office wrote it
Explore practice voice

Standards & Guidance

Built on the standards you already use

  • CAWS and Uniclass output, with NATSPEC and MasterFormat supported
  • Covers England, Wales, Scotland and Northern Ireland regulations
  • British Standards referenced correctly and kept current across editions
Explore standards and guidance

BIM Integration

Specs linked to your model

  • Plugins for Revit and Archicad
  • Products and schedules stay in sync between model and spec
  • One product register feeds every section, schedule and drawing reference
Explore BIM integration
Architectural BIM model coordinated with specification data
External wall systemModel and specification linked