Building Regs Tracker

Know which regs apply. And prove you met every one.

Avoice drafts the relevant requirements for your project, Part A to Part T, and links each one to the evidence that shows compliance: the spec clause, the drawing, the product data sheet, the note from building control. As the project moves, Avoice reads your specs, drawings and project email in the background and proposes updates to the tracker. Nothing changes until someone on your team accepts it.

Book a demo

Every requirement, accounted for.

Each regulation that applies gets an owner, a status and the Approved Document section it's measured against. Anything unevidenced stays visible until it isn't.

Evidence linked, not filed away.

Spec clauses, drawings, data sheets and correspondence attach to the requirement they satisfy. Change a linked clause or product and the requirement flags for review.

Issued like a drawing.

Publish the tracker as a numbered, dated compliance statement to your document register, with an audit trail behind every change. The golden thread is already there when you need it.

Starts with what applies.

Tell Avoice what you're building and it drafts the relevant requirements for you, Part by Part. There's no blank spreadsheet and no copying last project's tracker.

  • Requirements drafted from building type, use and scope of works
  • Each one mapped to the Approved Document guidance, down to the section
  • Owners and target stages assigned across the design team
  • Anything not relevant marked out of scope, with the reason recorded

Stays current without the chasing.

Avoice watches the project as it moves and proposes updates to the tracker. Your team reviews each one, and nothing changes until they accept it.

  • Proposals raised from spec changes, drawing revisions and project email
  • Evidence attached automatically when a proposal is accepted
  • Requirements flagged when a linked clause or product changes
  • Gaps surfaced before building control finds them

Ready when building control asks.

Issue the tracker as a compliance statement in a couple of clicks. It's numbered, dated and backed by a full audit trail, like any other project document.

  • Compliance statement published straight to the document register
  • Revision history for every issue, like a drawing
  • Audit trail showing who changed what, when and why
  • A golden thread record built as you go, not at handover