Instructions that cite the right clause

Issue a variation, a discrepancy, a provisional sum expenditure or any other instruction, and Avoice carries the clause reference, the cost and time effect, and the change back into the specification and the record.

Book a demo

AI-014 · Variation

Issued 12 Mar

Clause 3.14 · Riverside Mills · issued to Haldane Construction Ltd

Instruction
Omit painted MDF skirting to ground floor. Substitute solid oak, 19 x 120mm, clear lacquer.
Affects
Spec P20/310 · Drawing A-204 · Finishes schedule FS-01
Cost effect
+£4,820
Time effect
None stated

Spec clause P20/310 and the finishes schedule will update together on acceptance.

Every instruction type.

Variations, discrepancies, provisional sums, opening up, non-compliant work, named specialists, postponement, samples and dayworks, in one composer.

Priced and tracked.

Each instruction carries its cost and time effect, so the running total of change is visible rather than reconstructed at the end.

Into the record on issue.

Numbered, dated and filed automatically, with the affected clauses and drawings linked both ways.

Every kind of instruction, one composer

Not just variations. Most instruction tools handle changes and leave everything else to a letter. The ones that cause arguments later are the other kinds: opening up for inspection, work not in accordance with the contract, expenditure of a provisional sum. Avoice composes all of them with the wording and the clause each one requires.

  • Instruction type chosen first, which sets the clause and the required content
  • Wording drafted from the project documents, then edited by the architect
  • Issued as a numbered PDF to the contractor and anyone copied in

New instruction

Step 1 of 3

Choose the type. The clause reference follows from it.

Instruction typeClause reference
Variationcl. 3.14
Discrepancy in documentscl. 2.15
Expenditure of provisional sumcl. 3.16
Opening up and testingcl. 3.17
Work not in accordance with contractcl. 3.18
Postponement of workcl. 3.15

Change control that actually holds

The instruction and the specification stop disagreeing. A substitution approved on site and never written back into the spec is how a tender-issue document stops describing the building. When an instruction changes a specified product, Avoice updates the clause, the schedule and the product register together and issues the section as a new revision.

  • Approved substitutions flow into the clause, schedules and product register
  • Each affected section keeps its version history
  • Changes arriving by email are captured and offered as draft instructions

Change register

14 instructions
No.TypeEffectStatus
AI-012Provisional sum+£31,400Issued
AI-013DiscrepancyNilIssued
AI-014Variation+£4,820Issued
AI-015Opening upTBCDraft

Running change to date: +£36,220 against a contract sum of £12,840,000.

Nothing issued from memory

The clause is checked, not recalled. Instruction numbering, clause references and the people copied in are the small things that undermine an otherwise good decision. Avoice takes them from the uploaded contract and the project's own distribution list.

  • Clause references checked against the contract that was actually signed
  • Sequential numbering with no gaps, dated on issue
  • Filed to the project record, visible to anyone with access

Project record

Instruction filed

12 March 2026 · added automatically on issue

Entry
AI-014 issued to Haldane Construction Ltd
Kind
Document
Linked to
P20/310 · A-204 · FS-01 · Valuation 07
Issued by
Contract administrator