CDM Risk Register

Every design risk recorded. Every decision traceable.

Avoice keeps your CDM designer's risk register next to the drawings and specification it describes. As the design develops, it flags foreseeable risks, links each one to its source, and records how you eliminated, reduced or controlled it. When you issue, the register is already complete and every entry shows its evidence.

Book a demo

Every risk linked to its source.

Each entry points to the drawing, specification clause, product or email it came from. Anyone reviewing the register can see exactly why a risk was raised and where it lives in the design.

Design changes, flagged for review.

Revised drawings, swapped products, changed details. When a source moves, every risk entry it affects is flagged, so the register never quietly falls out of date.

Decisions on record, issue by issue.

Every entry records whether the risk was eliminated, reduced or controlled, who decided and when. Each issued register is kept, so you can show what was known at every stage.

Every risk linked to its source.

A designer's risk register is only as good as the design it describes. Avoice links each risk to the drawing, clause, product or survey it came from, so anyone reviewing the register can see why a risk was raised and where it sits in the design.

  • Risks raised from your drawings, specification and survey reports
  • Each entry linked to the drawing, revision and clause it came from
  • Open the source drawing or clause in one click from the register
  • Hazards grouped by construction, maintenance and demolition

Design changes, flagged for review.

Designs change and registers usually don't keep up. When a drawing is revised or a product is swapped, Avoice finds every risk that depended on it and asks the right person to check it before the change reaches site.

  • Every linked drawing, clause and product is watched
  • Affected risks are flagged as soon as a source changes
  • New risks are suggested for you to accept or dismiss
  • Nothing changes in the register until a person approves it

Decisions on record, issue by issue.

CDM asks designers to show their thinking. Avoice records whether each risk was eliminated, reduced, informed or controlled, and who made the call and when. Every issued register is kept, so you can show what was known at each stage.

  • An ERIC design response recorded for every risk
  • A named, dated history on every entry
  • Dated registers issued alongside your drawings
  • Residual risks shared with the principal designer and contractor