Every risk linked to its source.
Each entry points to the drawing, specification clause, product or email it came from. Anyone reviewing the register can see exactly why a risk was raised and where it lives in the design.
CDM Risk Register
Avoice keeps your CDM designer's risk register next to the drawings and specification it describes. As the design develops, it flags foreseeable risks, links each one to its source, and records how you eliminated, reduced or controlled it. When you issue, the register is already complete and every entry shows its evidence.
Book a demoEach entry points to the drawing, specification clause, product or email it came from. Anyone reviewing the register can see exactly why a risk was raised and where it lives in the design.
Revised drawings, swapped products, changed details. When a source moves, every risk entry it affects is flagged, so the register never quietly falls out of date.
Every entry records whether the risk was eliminated, reduced or controlled, who decided and when. Each issued register is kept, so you can show what was known at every stage.
A designer's risk register is only as good as the design it describes. Avoice links each risk to the drawing, clause, product or survey it came from, so anyone reviewing the register can see why a risk was raised and where it sits in the design.
Designs change and registers usually don't keep up. When a drawing is revised or a product is swapped, Avoice finds every risk that depended on it and asks the right person to check it before the change reaches site.
CDM asks designers to show their thinking. Avoice records whether each risk was eliminated, reduced, informed or controlled, and who made the call and when. Every issued register is kept, so you can show what was known at each stage.