Planning · England · Free to use
Urban Greening Factor calculator
London Plan Policy G5 score from surface types and areas, against the 0.4 residential or 0.3 commercial target.
London Plan (2021) and Urban Greening Factor LPG (2023)
Your inputs
Results update as you type.
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
m²
Planning · Result
UGF 0.4
Meets the 0.4 target with 970 weighted m² on a 2,400 m² site.
Checks passed- Trees, large soil volume: Calculated result180 m² × 0.8144
- Extensive green roof: Calculated result620 m² × 0.7434
- Flower-rich perennials: Calculated result140 m² × 0.798
- Rain gardens and SuDS: Calculated result60 m² × 0.742
- Hedges: Calculated result40 m² × 0.624
- Green wall: Calculated result90 m² × 0.654
- Groundcover: Calculated result80 m² × 0.540
- Amenity grassland: Calculated result260 m² × 0.4104
- Permeable paving: Calculated result300 m² × 0.130
- Sealed surfaces (0): Calculated resultremainder630 m²
- Urban Greening Factor: Checks passedtarget 0.40.4
- Score = sum of (factor × area) ÷ total site area (para 8.5.6). Retained green cover counts (Policy G5 C).
- Tree areas are the projected mature canopy area. Boroughs may set their own targets in local plans.
Clauses this relies on
Source edition and scope
London Plan (2021) and Urban Greening Factor LPG (2023).
This is a preliminary check of the conditions shown. Confirm the edition, project circumstances and any additional requirements with your architect or building control.
A design aid, not legal advice. Checked against the Building Regulations 2010 for England; confirm with building control.