How to Track Time Against RIBA Stages
Set up stages and budgets, record time the team can stand behind, and spot overruns while there is still time to act.
Fees are agreed and invoiced by stage, so time should be recorded by stage too. This guide covers project set-up, what a good time entry contains, how to read fee burn against progress and how to get the team filling timesheets in properly.
When each stage carries a fee and an hours budget, every timesheet entry becomes a small check against it.
Why time belongs to a stage, not just a project
Fees in UK architecture are agreed, invoiced and argued about by stage. If time is only recorded against the project, the practice finds out a stage ran over when the project is already in the next one, and the fee is already spent.
A project-level total hides the pattern that matters. Concept design that took twice its budget can be masked by a quiet construction stage months later, by which point the lesson is lost and the client conversation about extra work never happened. Coding time to the stage it belongs to makes each stage a small, checkable budget.
Stage-level time also feeds three other things a practice needs: fee proposals for the next job based on what similar stages actually took, evidence when a client asks for additional fees, and a realistic picture of how much work is left on each live project.
Set up the project structure first
Good timesheets start before anyone logs an hour. Each project needs its stages, a fee per stage and a budget in hours that the team can see.
The RIBA Plan of Work 2020 gives a structure most UK clients and consultants recognise. Use its stages as the top level and add your own sub-stages only where you invoice or manage separately, such as a planning submission inside Stage 3.
- 0
Strategic Definition
Often unpaid or time charged. Code it anyway.
- 1
Preparation and Briefing
Brief, surveys, feasibility, appointments.
- 2
Concept Design
Options, design development, client reviews.
- 3
Spatial Coordination
Coordination with consultants, planning.
- 4
Technical Design
Drawings, specification, tender information.
- 5
Manufacturing and Construction
Site visits, RFIs, submittals, instructions.
- 6
Handover
Defects, records, close-out information.
- 7
Use
Post-occupancy work if appointed.
Each stage gets a fee and an hours budget. Sub-stages are useful only where they are invoiced or managed separately.
Turning a stage fee into an hours budget
Divide the stage fee by a blended hourly rate for the team you expect to do the work. A blended rate is the weighted average of the people involved, so a stage led by a director with mostly Part 2 support will have a lower blended rate than one run mainly at associate level.
For example, a Stage 4 fee of £40,000 at a blended rate of £75 per hour gives a budget of about 533 hours. That number is what the team should see every time they log time, not a figure buried in the practice manager's spreadsheet.
What a good time entry contains
A time entry is evidence. It should be specific enough to support an invoice, a fee review or a claim for additional services months later.
Elm Court · 7.5 h · Monday
- 01 No stage, so it cannot be compared with any budget.
- 02 No activity, so it cannot support an invoice or claim.
- 03 No billable status, so recovery cannot be measured.
Project: Elm Court. Stage: 4 Technical Design. Activity: Door schedule and ironmongery coordination. Time: 2.75 h. Status: Billable. Person: Project architect.
The second entry can be compared with a budget, put on an invoice and used to price the next project. Example is illustrative.
Keep the code list short
Accuracy falls as code lists grow, because people pick the nearest option rather than the right one. A workable structure for most practices is project, stage and a short activity description, plus a handful of non-project codes: marketing and bids, training, practice administration and leave. Additional services and variations each get their own code with their own fee or rate.
Reading fee burn against progress
Hours used means nothing on its own. The useful number is hours used compared with how far through the stage the work really is.
Each week, the project lead estimates percentage complete for each live stage. Compare it with the percentage of the hours budget already used. If the two are close, the stage is on track. If fee used is running well ahead of progress, the stage will overrun unless something changes.
- Budget
- Stage 4 fee £40,000 at a blended £75 per hour gives about 533 hours.
- Used so far
- 400 hours logged, which is 75% of the budget.
- Progress
- The project lead estimates the stage is 60% complete.
- Signal
- Fee used is 15 points ahead of progress. At this rate the stage needs about 667 hours, roughly 133 over budget.
- Action
- Check for scope creep that should be an additional service, rebalance the team, or agree a revised fee with the client before the stage closes.
The worked figures are illustrative. The habit is what matters: a weekly comparison while the stage is still open, when there is still something to be done about it.
Getting the team to fill them in
Most timesheet problems are adoption problems. People fill in timesheets well when it is quick, when they can see why it matters and when the numbers come back to them.
- Log daily, not weekly.Friday reconstruction of a whole week is mostly guesswork.
- Show the budget at the point of entry.People make better choices when they can see the stage is 80% spent.
- Suggest, do not interrogate.Pre-fill from the documents, tasks and meetings people were actually in, and let them confirm.
- Keep codes stable.Changing the structure mid-project breaks comparisons and annoys everyone.
- Share the results.Show project teams their stage burn every week, not just the directors.
- Never use timesheets to blame.Overruns are information about scope and fees, not individual performance.
- Approve weekly.A quick project-lead check catches miscoded time before it reaches an invoice.
- Close stages formally.Lock a stage when it is invoiced so late time goes to the right place.
Questions practices ask
Short answers to the timesheet questions that come up most often.
How should architects track time?
Code every hour to a project, a RIBA stage and a short task description, and mark it billable or non-billable. Set an hours budget for each stage from the stage fee and a blended rate, then compare hours used with progress each week so overruns show while the stage is still running.
How do you calculate budget hours for a stage?
Divide the stage fee by the blended hourly rate for the team expected to do the work. A £40,000 stage at a blended £75 per hour gives a budget of about 533 hours.
How do you record site visits?
Against Stage 5 with a clear activity, including travel time if your appointment allows it to be charged. If the appointment caps site visits, track the count as well as the hours.
How do you track additional services?
Give each agreed additional service or variation its own code with its own fee or rate. That keeps the stage budget honest and makes the extra work billable. For pricing them, see how to calculate architects' fees.
Do we need a separate timesheet app?
Only if nothing else in the practice uses the data. Time is most useful in the same system as fees, invoices and resourcing. See our buyer's guide to project management software.
Where Avoice fits
Avoice records time in the same place the work happens, so timesheets are faster to fill and stage burn is visible without a spreadsheet.
In Avoice time tracking, hours are suggested from the specifications, drawings, tasks and project activity people have been working in, split into billable and non-billable automatically, and rolled up against each fee stage. Approved time flows into invoices that sync with Xero and QuickBooks, and financials show fee used against progress for every live stage.
To see your own project structured by stage, book a demo.