Architect Fee Proposal Template for UK Practices

A section-by-section outline of a UK fee proposal, with a template you can copy into your own letterhead.

A good fee proposal wins the work and protects the fee once the project starts. This guide sets out what each section should say, offers a template outline to copy, and explains how the proposal carries through into the appointment.

FIG. 01
From proposal to appointment

The scope, fee and assumptions in the proposal become the schedule of services and fee in the appointment.

01

What a fee proposal has to do

A fee proposal does two jobs. It persuades the client to appoint you, and it sets the boundaries of the service so that extra work can later be recognised and charged. Most proposals do the first job well and the second badly.

The client will read the total and the stage split first. Months later, when the brief has grown, the practice will read the scope, exclusions and assumptions. Those sections decide whether a request is a variation or part of the fee. Write them for that later reader.

A proposal is also the first draft of the appointment. ARB's guidance on Standard 4 of the Architects Code says architects should give clients clear written terms before work starts, covering among other things the scope of services and the fee or how it will be calculated. A proposal written with that in mind turns into an appointment with very little rework.

Every hour of unpaid extra work on a project can usually be traced back to a sentence that was missing from the fee proposal.

02

What goes in each section

A UK fee proposal has ten working parts. Each one answers a question the client or the practice will ask later.

Scope by stage
The RIBA stages you are appointed for and the services within each, written as deliverables: for example, "Stage 3: coordinated design and planning application drawings".
Exclusions
What is not included: other consultants' services, surveys, party wall matters, interior design, principal designer duties, more than a stated number of design options.
Fee basis
Lump sum, percentage of construction cost, time charge, capped time charge, or a mix by stage.
Stage split
The fee for each stage in pounds, so each can be invoiced and tracked on its own.
Additional services
Hourly rates by role for work outside the scope, and how it will be agreed before it starts.
Expenses
Included in the fee, charged at cost, or charged with a stated mark-up. Name printing, travel beyond a set distance and statutory fees.
Payment terms
When invoices are raised, such as monthly or at stage completion, and the period for payment.
VAT
State that fees are exclusive of VAT, which will be added at the prevailing rate.
Assumptions
Construction budget, programme, procurement route, number of meetings and site visits, and the information the client will provide.
Validity
How long the proposal stands, often 30 to 90 days, and what happens if the project pauses.

For how to build the number itself, bottom-up by hours and then checked against construction cost, see how to calculate architects' fees in the UK.

03

A template outline to copy

The outline below works for most small and mid-sized UK projects. Copy the headings into your letterhead and fill each one in plain language.

Fee proposal: section order

  1. Introduction: Project name, site address, client, date and a two-line summary of what the client has asked for.
  2. Our understanding of the brief: The project in your words, including the construction budget and target programme you have been given.
  3. Scope of services by RIBA stage: One short list of deliverables per stage, with the stages you are not appointed for stated as such.
  4. Exclusions: A clear list of services not included and who you expect to provide them.
  5. Fee: The fee basis, the total and a stage-by-stage split in pounds, excluding VAT.
  6. Additional services: Hourly rates by role, and a sentence saying extra work will be agreed in writing before it starts.
  7. Expenses: What is included and what is charged, and on what basis.
  8. Payment terms: Invoicing frequency, payment period and how late payment is handled.
  9. Assumptions: Budget, programme, procurement route, meetings, site visits and client-supplied information.
  10. Team and insurance: Who will lead the work, the architect in control, and confirmation of professional indemnity insurance.
  11. Appointment: The form of appointment you propose to use and what happens next.
  12. Validity and acceptance: How long the proposal is valid and how the client should accept it.
ILLUSTRATIVE STAGE SPLIT£60,000 lump sum, Stages 1 to 4
  1. 1

    Preparation and Briefing

    10%: £6,000

  2. 2

    Concept Design

    25%: £15,000

  3. 3

    Spatial Coordination

    30%: £18,000

  4. 4

    Technical Design

    35%: £21,000

FIG. 02
Show the split, not just the total

A fee split by stage can be invoiced, tracked against hours and adjusted stage by stage if the project changes. Percentages and amounts are illustrative; base yours on the hours each stage needs.

04

Weak and strong wording

Most disputes about fees come down to vague scope. A few extra words in the proposal make the difference between a variation the client accepts and one they contest.

Stage 2: concept design and client presentations.

  1. 01 No limit on the number of options or revisions.
  2. 02 No limit on the number of meetings.
  3. 03 No link to the budget the design is based on.

Stage 2: Up to two concept options developed into one preferred scheme, with one round of client revisions. Up to three client design meetings. Design based on the construction budget of £850,000 stated in the brief. Further options, revisions or meetings charged as additional services at the rates in section 6.

BOUNDEDMEASURABLEBUDGETEDCHARGEABLE
FIG. 03
The same stage, scoped two ways

The second version tells both sides exactly when the fee runs out and what happens next. Wording is illustrative.

  • Every stage has countable limits: options, revisions, meetings, site visits.
  • The construction budget the fee is based on is stated.
  • Additional services rates are given before they are needed.
  • Exclusions name the consultant or party expected to cover them.
06

Questions practices ask

Short answers to common fee proposal questions from UK architects.

What should an architect's fee proposal include?

Scope of services by RIBA stage, exclusions, the fee basis, a stage-by-stage fee split, additional services rates, expenses, payment terms, VAT, assumptions and a validity period. It should also name the form of appointment you intend to use.

Should architects' fees be quoted including or excluding VAT?

For business clients, practices usually quote fees exclusive of VAT and state that VAT will be added at the prevailing rate. For domestic clients who cannot reclaim VAT, it helps to show the VAT-inclusive total as well so there is no surprise.

How long should a fee proposal be valid for?

There is no fixed rule. Many practices state a period of 30 to 90 days and say the fee will be reviewed if the project starts later or pauses for a long time.

Is a fee proposal the same as an appointment?

No. A proposal is an offer, and the appointment is the signed contract. The accepted proposal should feed directly into the appointment's schedule of services and fee, and work should start only once the appointment is agreed.

How do you split an architect's fee across RIBA stages?

Estimate the hours each stage needs by role, price them, and use the result as the split. Express it in pounds and percentages so it can be invoiced stage by stage and compared with actual hours later.

07

Where Avoice fits

Avoice connects the fee proposal to the project it creates, so the price you quoted becomes the budget you track without re-keying.

In clients and CRM, a deal is priced by stage, team and hours, and that price becomes the proposal fee. When the deal is won, the project is created with its stages, fees and hours budget already filled in. The signed appointment can be uploaded to the project's contracts, with its particulars extracted, and the stage split drives the invoicing schedule. Timesheets then roll up against each stage so the practice can see how the real hours compare with the hours it priced.

To see a proposal turn into a live project, book a demo.